Waterproof coating in Kuwait - Anjafa

Waterproof coating in Anjafa

Waterproof coating in Anjafa protects roof concrete from water infiltration and moisture damage. We clean the surface, repair cracks, then apply multiple layers of liquid waterproof coating to form an airtight seal.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa has mid-rise residential buildings with flat concrete roofs on standard residential plots. Roofs here face seasonal rainwater pooling and dew accumulation, especially in cool months, and cracks from thermal shrinkage in the original concrete are common. Waterproofing starts with stripping old layers and scraping surface salt and rust, then injecting cracks with flexible filler before applying liquid coating layers.

Anjafa sits in Hawalli governorate, a residential district where concrete roofs need periodic waterproofing against moisture and infiltration.

Hairline cracks in Anjafa roofs typically do not exceed 2 mm width and require injection before liquid coating coverage.

Back to Waterproof coating

See also: Roof waterproofing in Anjafa

What the work covers - Waterproof coating

What the work covers

Substrate cleaning, crack repair and multi-coat application of liquid waterproof coating.

  • Surface inspection

    Locating cracks, open pores and any spalling before work starts.

  • Cleaning and decontamination

    Removing dust, oils and old loose layers for proper coating adhesion.

  • Crack filling

    Sealing hairline and wider cracks with flexible repair mortar before coating.

  • Primer coat

    A penetrating primer that anchors the waterproof coating into the concrete substrate.

  • Waterproof coating coats

    Applying at least 2 cross-direction coats for uniform thickness and full coverage.

  • Corners and drain sealing

    Reinforcing vulnerable junctions at corners, drain collars and window sills.

How it works.

  1. Contact us

    Call or WhatsApp us and send photos of the affected surface.

  2. Site assessment

    We visit to measure the area and assess concrete and existing coating condition.

  3. Surface preparation

    Cleaning, crack repair and applying the bonding primer coat.

  4. Coating application

    Applying waterproof coating coats with reinforced corners and drain details.

  5. Handover check

    Checking coverage, coat thickness and full cure before handing over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Waterproof coating in Anjafa

Call now
How do you treat concrete cracks before applying waterproof coating?

We inspect cracks carefully, clean them with compressed air, then inject them with flexible filler that follows concrete movement. We then apply liquid coating layers over the prepared surface.

Must the old waterproofing layer be fully removed before recoating?

If the old layer is still intact and free from delamination and blistering, we can apply a new coat after thorough cleaning. If deteriorated, we remove it entirely.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works