Kitchen gypsum in Kuwait - Hateen

Kitchen gypsum in Hateen

Kitchen gypsum in multi-storey apartment buildings in Hateen requires lightweight steel framing because ceilings and walls are shared between units. We conceal all distribution and drainage runs with moisture-resistant boards and finish all partition edges cleanly.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hateen is filled with multi-storey apartment buildings with adjacent units, so kitchen walls are often shared party walls with the neighbouring flat. This means every pipe and wire must be sound and thermally insulated to reduce noise and odour seepage between units. We use moisture-resistant boards and insulating fibre between the steel frame and boards, and completely separate drainage runs from wiring. Kitchen ceilings also connect to the building's central ventilation ducts, so we leave access hatches in the gypsum to reach filter maintenance and cleaning.

Hateen is in Hawalli governorate, a district of densely packed multi-storey apartment buildings near Hawalli.

We leave inspection hatches at least 30×30 cm in the gypsum ceiling to access central ventilation ducts and routine maintenance.

Back to Kitchen gypsum

See also: Gypsum board in Hateen

What the kitchen scope covers - Kitchen gypsum

What the kitchen scope covers

Steel framing, moisture-resistant boarding and full concealment of kitchen services.

  • Galvanised steel frame

    Correctly sized stud and track frame built to handle kitchen steam.

  • Moisture-resistant board

    Green-face moisture-resistant board used across all kitchen zones.

  • Extractor duct boxing

    Boxing the extractor duct in a tight gypsum frame with a neat grille opening.

  • Pipe and cable routing

    Water pipes and lighting cables routed behind board before fixing.

  • Taping and jointing

    Fibre tape and jointing compound built up to a smooth, paint-ready surface.

  • Precise service cut-outs

    Measured openings for light points, AC grilles and the extractor hood.

How it works.

  1. Call or whatsApp

    Contact us to arrange a kitchen site visit at a convenient time.

  2. Site measure and survey

    We measure ceiling and walls and record all existing service positions.

  3. Quote and layout drawing

    A detailed quote with a layout showing frame, service routes and cut-out positions.

  4. Framing and boarding

    Frame fixed, services routed, boards fitted with correct perimeter relief gaps.

  5. Finishing and handover

    Taping, jointing, priming and a final check before handing over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Kitchen gypsum in Hateen

Call now
How do you stop odours and noise from your kitchen reaching the next flat?

We place thick insulating fibre between the gypsum and steel frame, and create a completely separated cavity wall instead of a direct shared wall. We also apply moisture barrier on all surfaces.

Can you access the ventilation ducts for cleaning after the gypsum is done?

Yes, we leave sealed access hatches in the ceiling that can be opened and closed easily, and we mark their locations before handover.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works