Gypsum ceilings in Kuwait - Hateen

Gypsum ceilings in Hateen

Installing a gypsum drywall ceiling in Hateen conceals ducts and wiring while providing a flat, paint-ready surface. We measure carefully, suspend the metal grid, attach the boards, and seal all joints with gypsum compound.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hateen's residential buildings are mostly older stock, four to six storeys with narrow corridors and uneven floor levels. The exposed concrete ceilings carry visible water pipes and electrical runs, so installing gypsum board requires a strong horizontal frame and careful correction of surface irregularities to ensure the final ceiling is flat. The drop from the metal grid to the concrete structure ranges from 10 to 15 centimetres depending on pipe and cable heights.

Hateen is located in Hawalli governorate and consists of mid-rise residential buildings with exposed concrete ceilings and visible mechanical runs.

Most residential units in Hateen have a standard floor-to-ceiling height of 2.7 to 2.9 metres from slab to concrete soffit.

Back to Gypsum ceilings

See also: Gypsum board in Hateen

What the installation covers - Gypsum ceilings

What the installation covers

Level setting and grid suspension through to a paint-ready ceiling surface.

  • Level survey and layout

    Ceiling drop level set around AC diffuser and light positions.

  • Suspended metal grid

    Galvanised tracks and studs hung from concrete slab with threaded rods.

  • Services routing

    AC ducts and electrical conduits coordinated before boards are fixed.

  • Board fixing and cutting

    Boards cut precisely for light boxes and diffuser openings with no gaps.

  • Taping and jointing

    Fibre tape and multi-coat jointing compound feathered to a flat surface.

  • Paint-ready finish

    Sanding, cleaning and final inspection before handover for painting.

How it works.

  1. First contact

    Call or WhatsApp us to describe the space and book a site visit.

  2. Site survey

    We visit to measure the ceiling and map existing AC and electrical runs.

  3. Quotation

    A detailed quote covering materials, labour and work sequence.

  4. Installation and jointing

    Grid hung, services routed, boards fixed, joints taped and sanded flat.

  5. Inspection and handover

    Level, joints and cut-outs checked, then handed over paint-ready.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Gypsum ceilings in Hateen

Call now
How do we correct the old concrete ceiling's uneven surface before installing drywall?

We use a laser level to measure the deviations, then adjust the suspension points of the metal grid to achieve precise flatness. Any protruding concrete ridges that obstruct the grid are chipped away before installation.

Must we move or reroute pipes and wires before hanging the drywall?

We map the existing pipe and cable runs first and calculate the grid height to accommodate them. If runs are heavily congested, we coordinate with the electrical and plumbing trades to reroute non-critical lines.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works