
Gypsum-board room in Abu Fatira
Finished gypsum-board rooms in Abu Fatira are installed to add residential and storage space to existing houses on medium-sized residential plots. We supply galvanised steel frames with suspended boards and embedded service systems, finishing with a paint-ready surface.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Abu Fatira is a villa area with plot sizes ranging from 400 to 600 square metres and varied architectural designs from different building periods. Residential and storage additions to these villas are typically one or two rooms with limited dimensions and approved municipality setbacks. Most older villas also need electrical and drainage system upgrades during new gypsum installation, requiring coordination with existing systems and calibrated distribution openings.
Abu Fatira lies in Mubarak Al-Kabeer governorate, a settled villa residential area with buildings from multiple construction periods.
Villas in Abu Fatira typically maintain minimum 2-metre north and south setbacks to ensure natural light in added rooms.

What the build covers
Galvanised steel frame, screw-fixed boards, embedded services and a surface ready for paint.

Steel-stud frame
Galvanised runners and studs sized to the room height and layout.

Electrical and AC routing
Conduits and cables run through the frame before boards are fixed.

Board fixing
Boards screw-fixed to all walls and ceiling with correct perimeter gaps.

Door frame and openings
Door opening cut and framed with reinforced steel to carry the door frame.

Taping and jointing
Fibre tape and multiple compound coats on every joint for a flat surface.

Paint-ready surface
Light sanding and a final check before handover for painting.
How it works.
Contact and site visit
Call or WhatsApp us to arrange a site visit at your convenience.
Measurement and layout
We measure the space and mark service routes and the door position.
Frame installation
Galvanised runners and studs fixed to floor, slab and adjacent walls.
Services and boarding
Conduits and cables routed inside the frame before boards are screw-fixed.
Finishing and handover
Joints taped, surface levelled and room inspected before final handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Gypsum-board room
Other services in Abu Fatira
Questions about Gypsum-board room in Abu Fatira
Call nowCan a gypsum-board room be added to an older villa without disturbing the foundations?
Yes, if the site allows it. We build an independent steel frame on a separate light concrete base, without affecting existing foundations.
How do you integrate new services with existing villa systems?
We connect new electrical and water runs to collection points in the existing villa. We install separate meters and breakers for the new room, maintaining approved distances between water and electrical channels.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps