Wall breaking in Kuwait - Funaitees

Wall breaking in Funaitees

Wall breaking in Funaitees targets mid-rise apartment buildings with reinforced concrete walls and timber composite flooring. We break the required wall carefully without damaging the surrounding floors and columns, and leave a clean opening ready for finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees is a dense residential district with five to seven-storey apartment blocks on medium plots, their internal walls reinforced concrete or brick on timber frames, with composite flooring over steel or concrete beams. When breaking an internal wall between units or to expand space, water and electrical lines must be isolated and any horizontal beam must not be cut. We use a metal detector to map reinforcement and wiring before breaking, and precision hand tools to clear debris without vibrations that could damage timber connections.

Funaitees sits in Mubarak Al-Kabeer governorate near Mubarak Al-Kabeer town centre, a district of mid-rise residential buildings.

We map reinforcement and electrical lines before breaking using a standard metal detector.

Back to Wall breaking

See also: Demolition & removal in Funaitees

What the work covers - Wall breaking

What the work covers

Breaking internal walls from initial survey through to a clean, squared opening ready for finishing

  • Full partition removal

    Full block partition taken down keeping columns and slab intact

  • Partial wall opening

    Door or window opening cut into an existing wall with straight edges

  • Hidden services survey

    Locating electrical and plumbing lines before breaking starts

  • Dust and area containment

    Sheeting off adjacent rooms to stop breaking dust spreading

  • Block breaking method

    Hammer drill or disc cutter selected to suit wall thickness and block type

  • Opening edge finishing

    Edges chased and levelled ready for lintel or plaster finish

How it works.

  1. First contact

    Call or WhatsApp us and describe the wall to be broken

  2. Site survey

    We visit, check wall type, hidden services and surrounding conditions

  3. Prep and containment

    Adjacent openings sealed and floors protected before any breaking starts

  4. Breaking and clearing

    Wall broken with the correct tool and rubble collected immediately

  5. Final handover

    Edges dressed, site cleaned, and opening handed over ready for finishing

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wall breaking in Funaitees

Call now
Can you expand an apartment by breaking an internal wall?

Yes, if the wall is non-load-bearing. We conduct an initial survey to map the wall type and service routes, then break it carefully and leave a clean opening.

What can we expect from debris and dust when breaking a wall in an apartment building?

We use plastic sheets and local dust extraction to contain debris within the unit, remove rubble immediately, and hand over the opening with full cleaning before finishing.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works