Apartment renovation in Kuwait - Firdous

Apartment renovation in Firdous

Apartment renovation in Firdous requires understanding the three- and four-storey residential blocks typical of the area. We overhaul ceilings, walls, flooring and all services while respecting shared boundaries and common spaces between units.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Firdous buildings are typically built on medium-sized plots, three or four storeys high, with apartments of moderate size and limited service cavities. Renovation here focuses on rerouting water, electrical and drainage lines without disturbing load-bearing walls, keeping these runs carefully separated from neighbouring units. The exposed concrete ceilings require careful inspection before work begins, since any failure in waterproofing will affect residents above or below the renovated apartment.

Firdous is located in Farwaniya governorate, a residential district of medium-height apartment blocks near Sixth Ring Road.

Most Firdous apartments range from 90 to 150 square metres, with services running through tight cavities between units.

Back to Apartment renovation

What apartment renovation covers - Apartment renovation

What apartment renovation covers

Full or partial renovation of any apartment, addressing structure, finishes and all services.

  • Selective demolition and replanning

    Remove old finishes and non-structural partitions to suit the new layout.

  • Plumbing and drainage

    Replace or reroute concealed water supply and drainage lines inside the apartment.

  • Electrical works

    Update wiring, distribution board and lighting points to match the new fit-out.

  • Gypsum ceilings and paint

    Install gypsum ceilings hiding ducts, then apply climate-suitable paint systems.

  • Floors and wall finishes

    Lay tile, marble or parquet after waterproofing wet areas first.

  • Windows, doors and facade

    Replace aluminium frames, seal thermal gaps and refresh the apartment's external facade.

How it works.

  1. Call or whatsApp

    Contact us to book an on-site inspection of the apartment.

  2. Inspection and assessment

    We check services, finishes and document all defects found.

  3. Scope and quotation

    A detailed scope of work and clear itemised quote are submitted.

  4. Execution in sequence

    Services first, then finishes in the correct order.

  5. Inspection and handover

    Joint walkthrough before final handover of the apartment.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Apartment renovation in Firdous

Call now
Can water and electrical lines be rerouted in an older apartment without damaging neighbour units?

Yes, but it requires precise planning. We separate new service routes from neighbouring unit walls and use insulated conduits and pipes to prevent leaks or impact on adjacent apartments.

How long does it take to renovate a three-bedroom apartment in Firdous?

It depends on the condition of ceilings, walls and existing services. A full renovation typically takes six to ten weeks, including structural work, finishes and all utilities.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works