
Apartment renovation in Faiha
Apartment renovation in Faiha targets older residential units in low-rise buildings on relatively spacious plots. We strip floors and interior walls, reorganize spaces, then run fresh water, electrical and drainage lines with new finishes to suit current tenant needs.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Faiha apartments typically span three to four floors in buildings erected two decades or more ago, with old mosaic or tile flooring and non-load-bearing block partition walls. During renovation, we carefully remove old floors to trace buried drainage pipes and inspect vertical risers from the ground floor before expanding kitchens or bathrooms. Units with divided layouts sometimes need controlled removal of load-bearing walls, so we consult the engineer before any deep cuts.
Faiha lies in the Capital governorate, a quiet residential area surrounded by wide streets and Faiha Park.
Main drainage pipes in Faiha run approximately one and a half metres below the original floor level in most units.

What apartment renovation covers
Full or partial renovation of any apartment, addressing structure, finishes and all services.

Selective demolition and replanning
Remove old finishes and non-structural partitions to suit the new layout.

Plumbing and drainage
Replace or reroute concealed water supply and drainage lines inside the apartment.

Electrical works
Update wiring, distribution board and lighting points to match the new fit-out.

Gypsum ceilings and paint
Install gypsum ceilings hiding ducts, then apply climate-suitable paint systems.

Floors and wall finishes
Lay tile, marble or parquet after waterproofing wet areas first.

Windows, doors and facade
Replace aluminium frames, seal thermal gaps and refresh the apartment's external facade.
How it works.
Call or whatsApp
Contact us to book an on-site inspection of the apartment.
Inspection and assessment
We check services, finishes and document all defects found.
Scope and quotation
A detailed scope of work and clear itemised quote are submitted.
Execution in sequence
Services first, then finishes in the correct order.
Inspection and handover
Joint walkthrough before final handover of the apartment.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Apartment renovation
Other services in Faiha
Questions about Apartment renovation in Faiha
Call nowCan we change the apartment layout by removing interior walls?
Yes, after an initial engineering survey. Non-load-bearing walls are easily removed, but load-bearing walls require steel beams or temporary props before removal, depending on the building's original drawings.
How long does full renovation of a 100-square-metre apartment take?
It depends on the scope, but demolition, fresh services and basic finishing typically take ten weeks if the vertical risers are sound and no structural reinforcement is needed.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps