Wall porcelain tiling in Kuwait - Funaitees

Wall porcelain tiling in Funaitees

Porcelain wall tiling in Funaitees requires careful checking of concrete substrate and horizontal waterproofing, especially in residential buildings near low-lying areas. We fix tiles with moisture-resistant adhesive and seal joints to a high standard.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees features mid-rise residential buildings on deep plots, with foundations near the water table. Interior walls, bathrooms and kitchens need robust horizontal waterproofing before tiling to prevent rising damp from below. We check the concrete surface for cleanliness and absence of salts, then apply an epoxy barrier before the adhesive. Thick porcelain gives extra protection only if the substrate and waterproofing are sound.

Funaitees sits in Mubarak Al-Kabeer governorate, a residential area near low-lying zones.

We apply horizontal waterproofing with epoxy materials before tiling bathrooms and kitchens.

Back to Wall porcelain tiling

See also: Ceramic & porcelain tiling in Funaitees

What the work covers - Wall porcelain tiling

What the work covers

Substrate checking through tile fixing, grouting and final inspection on every wall

  • Substrate preparation

    Cleaning, levelling and priming the wall before any tile goes up

  • Tile fixing

    Full-bed adhesive and back-buttering to eliminate hollow spots

  • Levelling and alignment

    Laser level and tile levelling clips for a perfectly flat surface

  • Grouting and expansion

    Epoxy grout in wet zones, flexible silicone at all internal corners

  • Edge and trim finishing

    Precise cuts around sockets and openings with neat aluminium trim profiles

  • Post-fix inspection

    Tap-test across every tile to confirm full adhesion before handover

How it works.

  1. Contact and site visit

    Call or WhatsApp us to arrange a wall inspection at your property

  2. Assessment and quote

    We measure, check substrate condition and provide a detailed written quote

  3. Material selection

    Confirm tile choice, grout type and trim profiles before work begins

  4. Preparation and fixing

    Level substrate, fix tiles full-bed, then grout and seal all joints

  5. Inspection and handover

    Full tap-test, final clean and handover once every tile passes inspection

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wall porcelain tiling in Funaitees

Call now
Is rising damp from below ground a common problem in Funaitees?

Yes, because foundations are near the water table. We apply robust horizontal waterproofing with epoxy materials to interior walls before tiling.

How do you inspect the concrete substrate before fixing porcelain tiles?

We check the surface for cleanliness, absence of salts and cracks, verify concrete strength using mechanical tests, then apply a sealing compound before the adhesive.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works