
Tile-over-tile installation in Funaitees
Installing new tiles over old in Funaitees refreshes bathrooms and kitchens without structural disruption or tenant downtime. We assess the bond, prepare carefully, and set tiles level and flat.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Funaitees is a dense residential neighbourhood dominated by apartment blocks with medium and small units, most built in the 1980s and 1990s with conventional materials. Bathrooms and kitchens are tight, their floors and walls covered in old cracked or buckled tile from expansion and moisture. We gently test the bond, remove dirt and salt, then apply fresh adhesive to restore a level finish, essential since residential units need swift upgrading without evacuation.
Funaitees is in Mubarak Al-Kabeer governorate, a dense urban residential area near the administrative boundary of Mubarak Al-Kabeer.
Bathrooms and kitchens in Funaitees often have poor ventilation, raising moisture behind the old tile.

What the job covers
Assessing the existing tile bed, preparing the surface, and fixing new tiles solid and flat.

Existing tile check
Tap-testing the old tiles to locate hollow or loose areas before starting.

Surface preparation
Degreasing and abrading the glazed surface so adhesive bonds reliably.

High-bond adhesive
Applying a flexible adhesive rated for bonding over an existing ceramic layer.

Levelling and alignment
Using tile levelling clips to keep the new surface flat across the field.

Expansion joints
Leaving perimeter gaps and sealing them with flexible filler suited to Kuwait's heat.

Grouting and clean-up
Grouting joints with a humidity-suited type and cleaning the surface before handover.
How it works.
First contact
Call or WhatsApp us with the area description and location.
Site inspection
We visit to measure, tap-test tiles, and assess existing layer condition.
Quotation and approval
We submit a detailed quote covering materials, labour, and any removal zones.
Preparation and fixing
Surface abraded, adhesive applied, tiles fixed with levelling clips and expansion joints.
Grouting and handover
Joints grouted, surface cleaned, and area handed over after adhesive cure period.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Tile-over-tile installation
Other services in Funaitees
Questions about Tile-over-tile installation in Funaitees
Call nowCan bathroom tile be refreshed without full apartment evacuation?
Yes, installing new over old allows work while residents stay in the unit. We isolate the area, test the old tile, prep the surface, then set the new tile in two to three days.
Why does tile buckle and crack in Funaitees bathrooms?
Poor ventilation and trapped moisture under old tile cause the base layer to expand. We test for dampness, clean the old layer, then set a fresh base with calibrated expansion gaps.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps