Tile removal in Kuwait - Naeem

Tile removal in Naeem

Tile removal in Naeem serves multi-storey residential buildings and older villas with mixed ceramic and stone floors on standard concrete bases. We remove tile with full control and leave the concrete substrate intact and ready for new finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Naeem is a mixed residential area with four to six-storey buildings and relatively older villas, many featuring locally-sourced ceramic and stone tile of varying thickness, 8 to 12 cm over relatively thin concrete substrates. In multi-unit buildings especially, small apartments mean tight spaces, and debris collection requires vertical movement through stairs or central shafts. Core service runs for water, electricity and drainage also run close to floor level in lower storeys, so we verify them before breaking.

Naeem lies in Jahra governorate, a mixed residential district combining multi-storey buildings and older villas.

Floors in Naeem apartment buildings are typically poured at 10 cm thickness over a 20 cm aggregate and sand base.

Back to Tile removal

See also: Ceramic & porcelain tiling in Naeem

What tile removal covers - Tile removal

What tile removal covers

Controlled breaking and full debris clearance from floor to wall base, leaving a clean substrate.

  • Broken tile lifting

    Removing cracked or raised tiles without damaging adjacent walls or surfaces.

  • Adhesive bed removal

    Scraping off old adhesive beds to leave a flat, bondable concrete surface.

  • Wall tile removal

    Stripping wall ceramic and porcelain while preserving the plaster or block face.

  • Substrate inspection

    Checking the slab or plaster after removal for cracks, hollows or moisture.

  • Debris clearance

    Collecting and removing all broken tile debris from site on a daily basis.

  • Ready-base handover

    Handing over a clean, level surface ready for the new tiling team to proceed.

How it works.

  1. Call or whatsApp

    Describe the area, tile type and reason for removal to arrange a site visit.

  2. Site assessment

    We measure the area and check tile layers and substrate condition on site.

  3. Quotation

    A clear quote covering removal and full debris clearance is provided.

  4. Removal works

    Tiles are broken, adhesive scraped off, and debris removed without damaging the base.

  5. Substrate handover

    The clean, inspected surface is handed over ready for new tile installation.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Tile removal in Naeem

Call now
How do you remove tile from a small apartment in a multi-storey building?

We use lightweight electric breakers and portable extractors, bagging debris for removal through stairs or central cores. We protect corridors and stairwells against damage.

What if drainage or water pipes run directly under the floor?

We locate the pipe route beforehand using visual inspection and detection devices. We manually chip tile above pipes with extreme care, avoiding direct pressure on them.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works