Tile removal in Kuwait - Daiya

Tile removal in Daiya

Tile removal in Daiya serves mid-rise apartment blocks and villas on relatively large plots. We gently pry off old tiles and remove all rubble completely, ensuring a sound substrate for any new finish.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya is a quiet residential district with six to eight-storey apartment blocks and detached villas on spacious plots. Tile varieties range from old Spanish in older buildings to modern porcelain in newer units. Removing floor tiles in these structures requires understanding the substrate composition, as some sit on thin cement and others on aged screed. We use pneumatic-assisted hand tools and clear rubble with specialist vacuums to ensure no cracks or voids remain in the base layer.

Daiya sits in Capital governorate, a quiet residential district near the British School of Kuwait and Daiya Park.

Daiya apartment floors range between thin cement layers and aged screed boards that must be protected during removal.

Back to Tile removal

See also: Ceramic & porcelain tiling in Daiya

What tile removal covers - Tile removal

What tile removal covers

Controlled breaking and full debris clearance from floor to wall base, leaving a clean substrate.

  • Broken tile lifting

    Removing cracked or raised tiles without damaging adjacent walls or surfaces.

  • Adhesive bed removal

    Scraping off old adhesive beds to leave a flat, bondable concrete surface.

  • Wall tile removal

    Stripping wall ceramic and porcelain while preserving the plaster or block face.

  • Substrate inspection

    Checking the slab or plaster after removal for cracks, hollows or moisture.

  • Debris clearance

    Collecting and removing all broken tile debris from site on a daily basis.

  • Ready-base handover

    Handing over a clean, level surface ready for the new tiling team to proceed.

How it works.

  1. Call or whatsApp

    Describe the area, tile type and reason for removal to arrange a site visit.

  2. Site assessment

    We measure the area and check tile layers and substrate condition on site.

  3. Quotation

    A clear quote covering removal and full debris clearance is provided.

  4. Removal works

    Tiles are broken, adhesive scraped off, and debris removed without damaging the base.

  5. Substrate handover

    The clean, inspected surface is handed over ready for new tile installation.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Tile removal in Daiya

Call now
How do you handle tiles bonded to old screed layers?

We use flat chisels and low-pressure air hammers to gradually separate tiles from screed with steady prying, minimizing damage to the underlying layer.

Do you remove old adhesive and cement residue after tile removal?

Yes, we remove tiles first, then vacuum dust and rubble. Any additional adhesive prep or levelling is discussed based on surface condition and upcoming finish requirements.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works