Central AC design in Kuwait - Ardhiya Warehouses

Central AC design in Ardhiya Warehouses

Central AC design for Ardhiya Warehouses relies on uniform cooling loads across the large open space while accounting for high ceilings and no interior partitions. We draw a broad duct layout covering storage areas without hot spots.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

The area is occupied by large industrial warehouses and storage buildings with very high ceilings, usually 6 to 8 metres or more, limited openings and thick metal walls. That layout means heat stratification at the top and minimal wind effect from outside. Design requires cooling units of large capacity spread across a number of main ducts without complex branching, while calculating friction losses over long horizontal distances and far reaches.

Ardhiya Warehouses sits in Farwaniya governorate, a district of large contiguous industrial storage buildings.

We design air distribution with large-diameter main ducts to reduce friction losses over long distances in the warehouse.

Back to Central AC design

See also: Central AC installation in Ardhiya Warehouses

What the design covers - Central AC design

What the design covers

Detailed drawings that link heat-load figures to duct routes, unit sizes and grille positions

  • Heat load calculation

    Room-by-room cooling output needed based on area and exposure

  • System type selection

    Choosing between fully ducted and concealed fan-coil layouts

  • Duct routes and ceiling voids

    Mapping every duct run through the available ceiling void depth

  • Grille positions

    Supply and return grille locations laid out for even room coverage

  • Outdoor unit sizing

    Outdoor unit capacity matched to calculated loads, not guesswork

  • Coordination with gypsum works

    Duct layout aligned with gypsum ceiling design to avoid clashes

How it works.

  1. Call or whatsApp

    Describe the building, its area and the system type you have in mind

  2. Site survey

    We measure ceiling voids, check facade orientation and note any obstacles

  3. Load calculations

    Room-by-room heat gain figures calculated from survey data

  4. Drawing preparation

    Duct routes, sizes and grille positions drawn on dimensioned CAD plans

  5. Review and handover

    Drawings reviewed with you, comments addressed and final set handed over

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Central AC design in Ardhiya Warehouses

Call now
How do we handle the very high ceiling heights in the design?

We account for heat stratification at the top and direct discharge grilles at a downward angle to lower temperatures in the work zone below the ceiling.

Do we use complex branching in large warehouses?

No, we use few main ducts with large diameters and uniform distribution openings. This reduces noise and heat loss over long distances.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works