Bathroom retiling in Kuwait - Qibla

Bathroom retiling in Qibla

Fresh bathroom tiling in Qibla requires careful removal of old tile and thorough surface preparation before installation. We select moisture and heat-resistant materials to ensure lasting durability in Kuwait's climate.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most bathrooms in Qibla sit within older residential units of three to four storeys, where concrete walls and deep foundations are solid but moisture may have seeped through layers of old ceramic over the years. We strip the old tile with specialized tools and inspect the cement bed layer, then apply a waterproofing membrane before laying new tile with salt-resistant adhesive and grout.

Qibla sits in Kuwait's Capital governorate, an older residential zone near Gulf Road and Seif Palace.

We apply a thick waterproofing layer before tiling to seal any moisture channels left in the concrete by age.

Back to Bathroom retiling

See also: Bathroom renovation in Qibla

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Qibla

Call now
Do you remove old tile without damaging water and drain pipes below?

Yes. We use precision tools and work in stages, checking pipe locations beforehand, and clear dust and debris after removal.

Does the work include levelling the floor if it is uneven beneath old tile?

Yes, we inspect surface level after removal and apply a cement levelling layer as needed before waterproofing and tiling.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works