Bathroom retiling in Kuwait - Mubarak Al-Abdullah

Bathroom retiling in Mubarak Al-Abdullah

Bathroom retiling in Mubarak Al-Abdullah covers old tile removal, surface prep, waterproofing and installation of durable tiles rated for Kuwait's heat and humidity. We select materials that hold up to constant moisture and temperature swings.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mubarak Al-Abdullah is a suburban district of two to three-storey villas on medium-sized plots, and most bathrooms have tile that is twenty years old or older. Removing old tile requires careful scraping of the mortar bed and checking that the waterproof layers underneath stay intact, especially in bathrooms near roof tanks. After complete cleaning of the concrete surface, we apply a modern waterproof membrane before laying new tile to prevent water seeping into the floors below.

Mubarak Al-Abdullah sits in Hawalli governorate, a suburban district of uniform residential villas where most bathrooms need tile renewal and waterproofing updates.

The concrete floor in villa bathrooms must be fully cleaned of old mortar before any new waterproof membrane is applied.

Back to Bathroom retiling

See also: Bathroom renovation in Mubarak Al-Abdullah

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Mubarak Al-Abdullah

Call now
Does removing old tile damage the existing waterproof layer below?

If the membrane is sound we preserve it and build on it. If it is damaged we remove and replace it with a modern waterproof layer before the new tile goes down.

What makes good bathroom tile different from cheap tile?

Quality tile has very low water absorption and a glazed surface that resists salts and moisture. We choose tile that meets high standards and withstands foot traffic and constant dampness for years.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works