Bathroom retiling in Kuwait - Hateen

Bathroom retiling in Hateen

Fresh bathroom tiling in Hateen is built to withstand Kuwait's humidity and high heat. We carefully remove old tile, prepare the surface, apply waterproofing, then lay quality tile with tight grout joints.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Hateen villas were built decades ago with basic tile that has poor adhesion or cracks from heat. The bathrooms are relatively small with limited wall space and tiled floors over cabinetry underneath. Removing old tile from these floors requires care not to damage the wooden cupboards below, and surface prep takes extra time to level before waterproofing is applied. Modern-standard tile ensures better adhesion and longer resistance to seasonal moisture.

Hateen is in Hawalli governorate, a district of relatively older residential villas with interior tiling that needs periodic refresh.

Bathroom depth in Hateen villas typically does not exceed 2.5 metres, which simplifies surface prep and waterproofing of floors and walls.

Back to Bathroom retiling

See also: Bathroom renovation in Hateen

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Hateen

Call now
How do we handle wooden cabinetry under the bathroom floor when removing old tile?

We remove tile carefully from the top and avoid heavy tools that could crack wood. We inspect the cabinetry after removal and repair it if needed before waterproofing and new tile go down.

Will the new tile resist cracking from summer heat?

We use tile and adhesive rated for Kuwait's heat cycles. Tight grout joints and proper waterproofing reduce stress on tile and extend its lifespan.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works