Bathroom retiling in Kuwait - Abu Hasaniya

Bathroom retiling in Abu Hasaniya

Bathroom retiling in Abu Hasaniya provides complete old tile removal, precise preparation, strong waterproofing and installation of humidity-resistant porcelain tiles. The sea-facing villas in the area require tight waterproofing against direct marine exposure.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abu Hasaniya comprises large villas facing the sea directly, and their bathrooms experience salt-laden winds and high seasonal moisture. Old tile removal requires thorough inspection of the substrate and concrete base, as early seepage affects the entire structure. Waterproofing application must cover all corners, openings and edges adjacent to foundations, not just visible surfaces. The selected tiles should be high-density porcelain with advanced moisture and salt-resistant adhesive and grout.

Abu Hasaniya sits in Mubarak Al-Kabeer governorate, a coastal villa district facing the Gulf with direct sea views.

Corner and opening treatment requires specialized liquid or banding waterproofing membrane at full thickness before tile installation.

Back to Bathroom retiling

See also: Bathroom renovation in Abu Hasaniya

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Abu Hasaniya

Call now
What do you do if you find seepage in the base during tile removal?

We stop, clean the area and allow the base to dry completely, then apply a remedial waterproof coating before proceeding with new tiles and full waterproofing.

Do you use porcelain or ceramic tiles for sea-facing villas?

We use high-density porcelain because it absorbs far less moisture than standard ceramic, ensuring better protection in humid coastal conditions.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works