Bathroom retiling in Kuwait - Abu Fatira

Bathroom retiling in Abu Fatira

Bathroom retiling in Abu Fatira balances the older villas and newer buildings in a growing residential area. We remove failed grout and tile, waterproof the substrate, and lay tile that lasts years.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abu Fatira contains villas of varied ages, some built decades ago and others recently, on plots ranging from medium to large. Older villas often have original bathroom tile that has cracked or settled from natural concrete movement and moisture. Newer villas may need tile replacement for renovation reasons. The old substrate is often uneven, so we level it and apply waterproofing before laying fresh tile and grout. In both cases we ensure water drains beneath the ceramic and use materials suited to the humid climate.

Abu Fatira lies in Mubarak Al-Kabeer governorate, a district of mixed-age residential villas on medium to large plots.

We verify water drainage beneath new tile to prevent moisture buildup under the bathroom floor.

Back to Bathroom retiling

See also: Bathroom renovation in Abu Fatira

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Abu Fatira

Call now
Do older villas in Abu Fatira need complete bathroom tile removal?

Usually yes. Original old tile has cracks and does not provide adequate waterproofing. We remove all tile and grout, clean the substrate, apply fresh waterproofing, then lay new tile and grout.

How deep is the substrate preparation before you lay new tile?

We scarify and clean the substrate to at least 5 mm depth to remove old grout residue, salts and debris, then apply a 2, 3 mm modern waterproofing layer before laying tile.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works