Water tank installation in Kuwait - Andalus

Water tank installation in Andalus

Water tank installation in Andalus serves multi-storey apartment blocks and mixed villa buildings on regular-sized plots. We supply tanks sized to the number of units and building height, with full pressure testing before handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Andalus blends detached villas with residential blocks of four to six storeys on plots between 600 and 1000 square metres. The concrete frames are relatively modern and follow current building codes, making tank placement planning straightforward within the load allowance. For multi-storey buildings, careful review of roof strength and tank load distribution on the main structural columns is needed.

Andalus is in Farwaniya governorate near the Fourth Ring Road and Andalus Co-operative.

Residential blocks in Andalus typically require tanks ranging from 5 to 10 cubic metres depending on the number of housing units.

Back to Water tank installation

What the service covers - Water tank installation

What the service covers

Roof tank supply and fit, from frame installation through to pressure testing and commissioning

  • Roof tank installation

    Tank secured to a steel frame sized for the roof slab.

  • Inlet and outlet connections

    PPR supply, draw-off and overflow lines run and fused.

  • Float valve fitting

    Level-control float valve fitted and adjusted to stop overflow.

  • Isolation valves

    Isolation valves on supply and draw-off lines for future maintenance.

  • Pressure test

    System filled and every joint checked before handover.

  • Old tank replacement

    Old tank removed, frame inspected and new tank installed.

How it works.

  1. First contact

    Call or WhatsApp us with photos of the roof and existing tank.

  2. Roof survey

    Technician inspects the roof, frame and existing pipework on site.

  3. Quotation

    Detailed quote covering tank, frame, pipe runs and connections.

  4. Installation

    Frame fixed, tank placed, PPR lines fused and valves fitted.

  5. Test and handover

    Tank filled, joints pressure-checked, float valve set and handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Water tank installation in Andalus

Call now
Is it better to install one large tank or several smaller tanks?

It depends on roof strength and frame design. A single large tank is easier to maintain if the roof is strong and load distribution is good. Otherwise, several smaller tanks spread the load more evenly on the columns.

How long does tank installation and testing take after the frame is finished?

Installation and bracing usually takes two to three days. Water testing and full leak inspection takes one more day before system handover.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works