Water tank installation in Kuwait - Omariya

Water tank installation in Omariya

Roof tanks in Omariya sit atop medium-rise apartment blocks of 4 to 6 storeys and require tailored design for each building based on occupancy. We anchor them at designated load points in the concrete frame and ensure full pipe and route separation before the final pour.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Omariya buildings are 4 to 6-storey apartment blocks with small to medium units, many built in the 1990s and early 2000s using conventional structural methods. The roof tank serves multiple households, so it must be sized for peak simultaneous summer demand. We work with the structural engineer to modify roof details if needed to handle the extra load, and coordinate with existing pipes to avoid conflicts during installation.

Omariya sits in Farwaniya governorate, a district of adjoining residential apartment blocks on regular plots in the suburban residential zone.

Roof tanks for apartment buildings in Omariya range from 20 to 30 cubic metres to cover 20 to 30 residential units.

Back to Water tank installation

What the service covers - Water tank installation

What the service covers

Roof tank supply and fit, from frame installation through to pressure testing and commissioning

  • Roof tank installation

    Tank secured to a steel frame sized for the roof slab.

  • Inlet and outlet connections

    PPR supply, draw-off and overflow lines run and fused.

  • Float valve fitting

    Level-control float valve fitted and adjusted to stop overflow.

  • Isolation valves

    Isolation valves on supply and draw-off lines for future maintenance.

  • Pressure test

    System filled and every joint checked before handover.

  • Old tank replacement

    Old tank removed, frame inspected and new tank installed.

How it works.

  1. First contact

    Call or WhatsApp us with photos of the roof and existing tank.

  2. Roof survey

    Technician inspects the roof, frame and existing pipework on site.

  3. Quotation

    Detailed quote covering tank, frame, pipe runs and connections.

  4. Installation

    Frame fixed, tank placed, PPR lines fused and valves fitted.

  5. Test and handover

    Tank filled, joints pressure-checked, float valve set and handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Water tank installation in Omariya

Call now
Can a tank be mounted on an older building without extra reinforcement?

We first assess the concrete frame condition. If the roof is sound and columns beneath are properly positioned, reinforcement may not be needed. However, we sometimes add extra steel beams to distribute the load more effectively.

What is the safe clearance between a roof tank and existing drainage pipes?

We maintain at least 50 centimetres between the tank and drainage pipes to allow safe maintenance and proper ventilation. This prevents sewage from contaminating the clean tank if a pipe fails.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works