Water tank installation in Kuwait - Rai Industrial

Water tank installation in Rai Industrial

Water tanks in Rai Industrial serve workshops and warehouses spread over large areas, so we install larger-capacity tanks and longer distribution pipework. Fitting is done to the industrial facility's specifications with scheduled inspection schedules.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Industrial buildings in Rai are large sheds and warehouses with high ceilings and wide plots, some stretching over sixty metres in length. The roof tank must be positioned near the building's centre to provide even pressure throughout all corners, especially on hot days when consumption rises. We mount the tank on a steel frame welded to the roof and test it at full load before commissioning, because workshops and factories cannot tolerate any service interruption.

Rai Industrial is in Farwaniya governorate, adjacent to The Avenues Mall complex.

Industrial tanks in Rai typically hold one hundred cubic metres or more to serve the large buildings.

Back to Water tank installation

What the service covers - Water tank installation

What the service covers

Roof tank supply and fit, from frame installation through to pressure testing and commissioning

  • Roof tank installation

    Tank secured to a steel frame sized for the roof slab.

  • Inlet and outlet connections

    PPR supply, draw-off and overflow lines run and fused.

  • Float valve fitting

    Level-control float valve fitted and adjusted to stop overflow.

  • Isolation valves

    Isolation valves on supply and draw-off lines for future maintenance.

  • Pressure test

    System filled and every joint checked before handover.

  • Old tank replacement

    Old tank removed, frame inspected and new tank installed.

How it works.

  1. First contact

    Call or WhatsApp us with photos of the roof and existing tank.

  2. Roof survey

    Technician inspects the roof, frame and existing pipework on site.

  3. Quotation

    Detailed quote covering tank, frame, pipe runs and connections.

  4. Installation

    Frame fixed, tank placed, PPR lines fused and valves fitted.

  5. Test and handover

    Tank filled, joints pressure-checked, float valve set and handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Water tank installation in Rai Industrial

Call now
Does a roof tank provide enough pressure for a sixty-metre-long workshop?

It depends on the tank height above the furthest point in the workshop. We calculate the required height and position the tank to deliver at least half a bar pressure throughout even during peak usage hours.

How is the tank tested before the factory runs at full capacity?

We fill the tank completely and open all drain and consumption points for one hour to observe flow and pressure under full load. We check for any leaks or pressure drop and record results before handover.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works