
Storm-drain network design in Funaitees
Storm-drain network design in Funaitees integrates surface runoff calculation from villas, low-rise apartment blocks and light commercial zones. We plot pipe routes, channels and inspection wells while respecting sea level, adjacent plots and existing underground utilities.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Funaitees is a mixed residential area with detached villas and 2, 3-storey apartment blocks on medium-sized plots (500, 1000 m²), with clay soil and high water table near the coastline. Stormwater drainage here needs additional pipe insulation and slightly deeper trenches to prevent backflow from groundwater. We must also study how sea level affects the final discharge point and obtain Mubarak Al-Kabeer municipality approval for collection well drilling.
Funaitees is in Mubarak Al-Kabeer governorate, a residential area near the coast with a high water table.
The groundwater table in Funaitees sits 1, 2 m below grade, affecting trench depth design.

What the design covers
Complete design from flow calculation through to construction-ready drawings

Runoff calculation
Sizing the network to the catchment area and surface slopes

Pipe diameter selection
Selecting each pipe section diameter to carry peak flow without surcharging

Network routing plan
Mapping pipe routes to avoid clashes with other service lines

Gradient and invert levels
Setting gradients and invert levels so water flows by gravity throughout

Inspection chamber layout
Positioning and sizing chambers at every junction and change of direction

Construction drawings
Producing dimensioned drawings and level schedules ready for site execution
How it works.
Initial contact
Call or WhatsApp us to describe the site and request a visit
Site survey
We visit, record levels, and collect any existing building drawings
Hydraulic calculations
We calculate flow, select diameters, and set gradients for every pipe run
Drawing production
We produce fully dimensioned construction drawings with levels and structural details
Handover and review
We hand over drawings and walk through any revisions before site work begins
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Storm-drain network design
Other services in Funaitees
Questions about Storm-drain network design in Funaitees
Call nowHow do we handle high groundwater in network design?
We raise trench depth slightly and use pipes with moisture-resistant joints, adding a gravel and sand layer around pipes for seepage drainage. We also check for existing drainage wells that may affect the design.
Should stormwater pipes be separated from drinking-water pipes?
Yes, the two networks must be separated by a minimum 1.5 m horizontal or 0.6 m vertical distance per building code, which requires careful planning on medium-sized plots where space is tight.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps