Storm-water drainage in Kuwait - Funaitees

Storm-water drainage in Funaitees

Storm drainage in Funaitees serves apartment blocks, shops and villas at varying elevations. We design efficient collection networks from roofs and walkways to clear water rapidly before it pools at entrances and shop fronts.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees is a mixed-use district with multi-storey apartment blocks, ground-level shops and detached villas, with noticeable changes in ground elevation. This variation means rainwater flows from higher to lower areas, so we install side channels along streets and walkways to intercept water before it reaches villas or buildings. We calculate the safe discharge level and ensure all outlets connect to the main municipality network without blockages.

Funaitees is in Mubarak Al-Kabeer governorate near Al-Farwaniya district, a mixed-use area of apartment blocks and villas on uneven ground.

We account for elevation differences between nearby areas and install side channels to catch surface runoff.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Funaitees

Call now
How do you manage water flowing from higher to lower ground areas?

We install crosswise channels at regular slope to intercept water from higher areas and direct it to the main drain network instead of letting it run randomly toward villas or shops.

Does draining rainwater from an apartment block need different handling than from a detached villa?

Yes, an apartment block requires a central rooftop collection system connected to downpipes at corners or midpoints, while a villa uses gravel trenches around foundations and small soakage tanks.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works