Storm-water drainage in Kuwait - Abraq Khitan

Storm-water drainage in Abraq Khitan

Storm drainage in Abraq Khitan protects residential villas and housing buildings on flat terrain with seasonal rainfall. We design and install piping and collection tanks with adequate capacity to rapidly clear water from each plot.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abraq Khitan is a relatively new residential zone with villas and housing units on medium plots with moderately deep foundations. The soil here is clay mixed with sand, which means slow natural water seepage, making the storm network essential to protect foundations from saturation. We install collection piping at specified diameters from roofs and walkways to underground or boundary-sited collection tanks, ensuring final discharge flows to the municipality network or an approved soakage pit. Moderate foundation depth allows safe, straightforward excavation for installation.

Abraq Khitan lies in Farwaniya governorate, a modern residential zone with varied housing buildings on level terrain.

Clay soil in Abraq Khitan requires drainage piping with adequate slope to prevent water pooling and foundation saturation.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Abraq Khitan

Call now
Is one collection tank enough for a medium-sized plot or do we need multiple tanks?

It depends on roof size and expected rainfall. A medium plot typically needs one tank of 8 to 12 cubic metres, or two if the area is larger.

How do you protect foundations from moisture in clay soil?

The drainage network collects rainwater quickly and diverts it from foundations. We install perimeter piping around the foundation footing that discharges into the tank, preventing water accumulation around the base.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works