Municipal sewer connection in Kuwait - Abraq Khitan

Municipal sewer connection in Abraq Khitan

Municipal sewer connection in Abraq Khitan requires extending lines from villas and buildings to approved connection points. We verify gradient and slope before and after testing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abraq Khitan is a mixed residential area with villas on medium-sized plots and some modern apartment buildings. Most older villas have conventional drainage systems that may not meet current standards, and new buildings need proper public network connection. We extend pipes from each building at the required slope and test the line with hydraulic pressure or water per municipality standards before handover.

Abraq Khitan sits in Farwaniya governorate, a mixed residential area of newer and older villas.

Drainage lines in Abraq Khitan must pass a hydrostatic pressure test at 0.5 bar for 30 minutes before work acceptance.

Back to Municipal sewer connection

What the service covers - Municipal sewer connection

What the service covers

We run the private drain line out to the public manhole, test and reinstate

  • Connection survey

    Locating the public manhole and planning the pipe route

  • Trench excavation

    Cutting the trench to adequate depth without disturbing nearby foundations

  • uPVC pipe run

    Laying uPVC drain pipe on a sand bed with continuous fall to the network

  • Intermediate chamber

    Setting an inspection chamber at bends and at required inspection intervals

  • Public manhole entry

    Coring the manhole wall and sealing the connection with hydraulic mortar

  • Flow test and backfill

    Running a water flow test before backfilling the trench in compacted layers

How it works.

  1. First contact

    Call or WhatsApp us describing the building location and connection need

  2. Site survey

    Our engineer visits to locate the public manhole and plan the route

  3. Quotation

    A detailed quote covering excavation, pipes, chambers and reinstatement is issued

  4. Works and testing

    We excavate, lay pipe, connect to manhole and flow-test before backfilling

  5. Backfill and handover

    Trench is compacted in layers, surface reinstated and site handed over clean

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Municipal sewer connection in Abraq Khitan

Call now
Do you test the line immediately after laying before final backfilling?

Yes, we perform a hydrostatic pressure test or water test per municipality standards to ensure no leaks at any joint before final backfilling.

Do you connect older villas to the public network in Abraq Khitan?

Yes, we assess old drainage systems and extend a new line from the building to the public manhole at the required gradient and current standards.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works