Apartment first-fix plumbing in Kuwait - Sabahiya

Apartment first-fix plumbing in Sabahiya

Apartment first-fix plumbing in Sabahiya involves running cold and hot supply points and drain branches for each unit in residential blocks on medium plots before walls and ceilings close. We test each flat separately for pressure and flow before final coverage.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sabahiya is a residential district with two to four storey buildings on plots 25 to 35 metres deep, and the flats range from studios to three-bedroom units. This variety means each unit may need a different number of water and drain points, so we design the routes flexibly to accommodate different flat sizes. Sabahiya plots often have a small courtyard or patio, which lets us run extra points for gardens or outdoor areas without complicating the internal network.

Sabahiya lies in Ahmadi governorate, a quiet residential zone with medium-height buildings spread across relatively wide plots.

We run drain branches in 50 to 75 mm pipes from each bathroom and kitchen toward the central vertical risers in the building.

Back to Apartment first-fix plumbing

See also: First-fix plumbing, new houses in Sabahiya

What the first-fix covers - Apartment first-fix plumbing

What the first-fix covers

Dedicated cold and hot supply points plus drain branches for each apartment, isolated and tested.

  • Cold supply runs

    PPR pipe from the apartment riser to every cold outlet point.

  • Insulated hot supply

    PPR hot runs fully sleeved with closed-cell foam inside wall chases.

  • Drain branch layout

    uPVC swept branches from each fixture point to the vertical stack.

  • Per-apartment isolation

    Isolation valve per apartment so one unit can be shut off independently.

  • Stub-out heights and offsets

    Every supply and drain stub set to fixture drawing dimensions before screed.

  • Pressure test and handover

    Documented pressure test per apartment before plastering, with a route record.

How it works.

  1. Call or whatsApp

    Share apartment drawings, floor count and current construction stage for an initial assessment.

  2. Site visit

    Inspect wall chases, stack positions and planned fixture outlet locations on site.

  3. Quotation and spec

    Detailed quote listing pipe grades, fittings, insulation scope and isolation valve positions.

  4. First-fix execution

    Lay all supply and drain lines to exact heights and offsets from fixture drawings.

  5. Test and handover

    Pressure test each apartment and hand over a pipe-route record before plastering starts.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Apartment first-fix plumbing in Sabahiya

Call now
Can extra water points be run to the outdoor garden before walls close?

Yes, we run separate pipes to gardens and outdoor areas from the main supply point before entering the building, and finish them with outdoor taps. This is easier and more cost-effective if planned before walls close in.

What if the flat has two bathrooms and a separate laundry area?

We run separate drain points for each bathroom and the laundry area from independent routes, each with its own branch at the required gradient. We test each branch separately before the walls close in.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works