Apartment first-fix plumbing in Kuwait - Hateen

Apartment first-fix plumbing in Hateen

First-fix plumbing in Hateen means running separate cold and hot supply points and drain branches for each apartment before walls close. We test every isolated line before it gets covered.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most buildings in Hateen are multi-unit residential on medium-sized plots, each holding three to five apartments with separate kitchens and bathrooms. We run the main lines from the meter chamber below through isolated branches to each unit, and fix the supply points in the wall before the slab pour or column reinforcement. Water and pressure testing happens before any insulation or plastering, since repairs later mean breaking new walls.

Hateen sits in Hawalli governorate, a residential district of multi-unit apartment buildings on regular plots near main roads.

We test every water and drain line at no less than three bar pressure before any covering.

Back to Apartment first-fix plumbing

See also: First-fix plumbing, new houses in Hateen

What the first-fix covers - Apartment first-fix plumbing

What the first-fix covers

Dedicated cold and hot supply points plus drain branches for each apartment, isolated and tested.

  • Cold supply runs

    PPR pipe from the apartment riser to every cold outlet point.

  • Insulated hot supply

    PPR hot runs fully sleeved with closed-cell foam inside wall chases.

  • Drain branch layout

    uPVC swept branches from each fixture point to the vertical stack.

  • Per-apartment isolation

    Isolation valve per apartment so one unit can be shut off independently.

  • Stub-out heights and offsets

    Every supply and drain stub set to fixture drawing dimensions before screed.

  • Pressure test and handover

    Documented pressure test per apartment before plastering, with a route record.

How it works.

  1. Call or whatsApp

    Share apartment drawings, floor count and current construction stage for an initial assessment.

  2. Site visit

    Inspect wall chases, stack positions and planned fixture outlet locations on site.

  3. Quotation and spec

    Detailed quote listing pipe grades, fittings, insulation scope and isolation valve positions.

  4. First-fix execution

    Lay all supply and drain lines to exact heights and offsets from fixture drawings.

  5. Test and handover

    Pressure test each apartment and hand over a pipe-route record before plastering starts.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Apartment first-fix plumbing in Hateen

Call now
How do you isolate water and drain points for each apartment in the same building?

We run separate cold and hot lines from the meter chamber to each apartment, and install isolation valves for each unit so they can cut supply or maintain independently without affecting neighbours. Drain branches run in separate paths to the main stacks.

When are the pipes tested and what comes after?

Testing happens after all lines and points are fixed and connected, before any insulation or plastering. We fill the line with water and apply specified pressure for an hour or more, then issue written approval before plastering starts.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works