First-fix plumbing, new houses in Kuwait - Hassawi

First-fix plumbing, new houses in Hassawi

First-fix plumbing in Hassawi covers a villa and outdoor facilities on an open plot. We extend water and drain lines from the street meter to the main building and any outdoor bathroom or washroom.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hassawi plots are medium to large with a villa and green areas plus an outdoor washroom. First-fix requires careful routing of the main water line from the street across the garden to the building, avoiding trees and foundations. It also needs a separate drain line for outdoor toilets with safe slope toward the main septic pit. We install multiple outdoor fixture points for irrigation or cleaning, with thermal insulation for hot lines exposed to sun.

Hassawi is in Farwaniya governorate, a district of residential villas on relatively large plots with green spaces.

Underground water lines in Hassawi are buried at least 80 cm deep to avoid heat damage and mechanical injury.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Hassawi

Call now
How do we protect water lines running across the garden from heat and damage?

We bury pipes at safe depth and cover them with a protective layer of sand and gravel. Hot lines get thermal insulation before burial to minimize heat loss.

Do outdoor bathrooms need a separate drain line?

Yes, we install an independent drain line for the outdoor bathroom with steady slope toward the main septic pit or catch tank. This prevents blockage of the main line and makes later maintenance easier.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works