First-fix plumbing, new houses in Kuwait - Anjafa

First-fix plumbing, new houses in Anjafa

First-fix plumbing in Anjafa focuses on modern apartment buildings and villas on medium-sized plots with updated building controls. We extend water and drain networks to approved standards before external and internal envelopes close.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa has modern apartment buildings of six to nine storeys and villas on plots between five hundred and one thousand square metres, mostly redevelopment or new construction projects. Vertical pipes run through central ventilation shafts or dedicated service walls, and horizontal pipes distribute from distribution rooms on the ground floor. Every floor needs full inspection before slab pouring, and any pipe leak or crack is repaired before handover.

Anjafa is in Hawalli governorate, a modern residential district set among older surrounding areas.

We pressure-test every water network in Anjafa at ten bar for two hours before pipes are covered.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Anjafa

Call now
Do you test pipes before walls are closed?

Yes, we pressure-test water networks and visually inspect drain networks, documenting results before any coverage.

How do you handle piping in modern projects on flat ground?

We use sub-ground or ground-floor distribution rooms per drawings, ensure drain lines slope toward lift stations, and secure pipes with approved supports.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works