Pool renovation in Kuwait - Taima

Pool renovation in Taima

Pool renovation in Taima repairs cracks and leaks caused by extreme heat and severe aridity. We use specialized sealants and coatings to restore basins to safe working condition.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Taima villas are small to medium-sized on standard plots in the desert suburbs with small private pools. The extremely harsh desert environment causes perpetual dryness and severe daily temperature swings that mark concrete and finishes. Fine cracks form very quickly and escalate to leaks without prompt repair. Water quality testing and regular filter maintenance are essential because dust and sand accumulate rapidly.

Taima sits in Jahra governorate, a remote residential area in Kuwait's desert suburbs far from the coast.

Pool basins in the area are typically small, ranging from 15 to 20 square metres with a consistent depth of around 1.2 metres.

Back to Pool renovation

See also: Swimming pools in Taima

What pool renovation covers - Pool renovation

What pool renovation covers

Targeted or full-scope work that brings the pool back to sound, watertight condition

  • Shell crack repair

    Crack injection and sealing to restore a watertight concrete shell

  • Waterproofing renewal

    Strip failed waterproofing layers and apply a fresh system to the shell

  • Tile and mosaic replacement

    Remove lifting or cracked tiles and re-lay with correct adhesive and grout

  • Interior replastering

    Remove old render and apply a smooth waterproof plaster coat throughout

  • Coping and deck repair

    Repair or replace the coping stones and surrounding deck finish

  • Fitting and pipe upgrade

    Replace aged inlets, outlets, valves and pipe runs during the drain-down

How it works.

  1. First contact

    Call or WhatsApp us and describe the visible condition of your pool

  2. Site inspection

    We visit, inspect the shell, tiles and fittings and define the full work scope

  3. Quotation and approval

    A detailed quote covering works, materials and schedule is submitted for your approval

  4. Drain-down and renovation

    Pool is drained, shell repaired, waterproofing applied and new finish installed

  5. Testing and handover

    Pool is refilled, water level monitored and all fittings checked before handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Pool renovation in Taima

Call now
How does severe aridity affect the lifespan of a renovation?

Aridity speeds cracking of new coatings unless we use flexible sealants. We select products engineered for continuous expansion and contraction in desert conditions.

Do you recommend covering the pool in summer?

Yes, a pool cover reduces water loss from rapid evaporation and desert dust, and protects new finishes from direct sun and extreme heat.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works