
Additional floor in Taima
Adding a floor in Taima requires testing desert soil and seasonal expansion before new foundation design. We assess expected soil settlement under additional load and design columns and beams that withstand desert climatic conditions.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Taima is a desert area with variable sand and clay soil, and residential houses have shallow or moderate-depth foundations due to rocky layers close to the surface. Seasonal expansion and contraction affect old foundations, so we sample soil to at least 2 metres depth to understand layering and salt content. Any additional floor significantly increases soil load, so we first document the existing building's actual settlement, then design the new floor's foundations with a larger safety margin.
Taima lies in Jahra governorate, a residential area in the southern desert suburbs of Jahra.
We require differential settlement testing between corners of the existing building before designing a new floor on desert soil.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Taima
Questions about Additional floor in Taima
Call nowDoes seasonal soil expansion affect the added floor?
Yes, seasonal expansion and contraction in Taima can reach several centimetres. We design foundations at greater depth with larger shrinkage allowance, and use gravel layers to isolate from seasonal moisture.
How do we measure the building's current settlement before adding a floor?
We fix reference marks on columns and foundations, use precision levelling to measure vertical differences. We repeat measurements over several weeks to track cumulative and differential settlement across different points.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps