Adding a floor in Taima requires testing desert soil and seasonal expansion before new foundation design. We assess expected soil settlement under additional load and design columns and beams that withstand desert climatic conditions.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Taima is a desert area with variable sand and clay soil, and residential houses have shallow or moderate-depth foundations due to rocky layers close to the surface. Seasonal expansion and contraction affect old foundations, so we sample soil to at least 2 metres depth to understand layering and salt content. Any additional floor significantly increases soil load, so we first document the existing building's actual settlement, then design the new floor's foundations with a larger safety margin.

Taima lies in Jahra governorate, a residential area in the southern desert suburbs of Jahra.

We require differential settlement testing between corners of the existing building before designing a new floor on desert soil.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Taima

Call now
Does seasonal soil expansion affect the added floor?

Yes, seasonal expansion and contraction in Taima can reach several centimetres. We design foundations at greater depth with larger shrinkage allowance, and use gravel layers to isolate from seasonal moisture.

How do we measure the building's current settlement before adding a floor?

We fix reference marks on columns and foundations, use precision levelling to measure vertical differences. We repeat measurements over several weeks to track cumulative and differential settlement across different points.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works