Pool renovation in Kuwait - Daiya

Pool renovation in Daiya

Pool renovation in Daiya focuses on swimming basins in upscale villas and mid-range apartment blocks, where stalled pools often need re-sealing, deep cleaning and safe restart.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya pools vary widely in size and depth depending on villa and apartment design. Many have sat unused for years due to deferred maintenance or building renovations, leading to algae and sediment buildup on floors and walls. We fully drain the pool and clean all surfaces, then inspect the lining, water inlet and outlet lines, and filtration equipment, before tackling any visible damage and refilling fresh.

Daiya is in Capital governorate, a villa and apartment district near the British School and Daiya Park.

Most filtration systems in Daiya pools need pump and filter replacement when restarting after a long shutdown.

Back to Pool renovation

See also: Swimming pools in Daiya

What pool renovation covers - Pool renovation

What pool renovation covers

Targeted or full-scope work that brings the pool back to sound, watertight condition

  • Shell crack repair

    Crack injection and sealing to restore a watertight concrete shell

  • Waterproofing renewal

    Strip failed waterproofing layers and apply a fresh system to the shell

  • Tile and mosaic replacement

    Remove lifting or cracked tiles and re-lay with correct adhesive and grout

  • Interior replastering

    Remove old render and apply a smooth waterproof plaster coat throughout

  • Coping and deck repair

    Repair or replace the coping stones and surrounding deck finish

  • Fitting and pipe upgrade

    Replace aged inlets, outlets, valves and pipe runs during the drain-down

How it works.

  1. First contact

    Call or WhatsApp us and describe the visible condition of your pool

  2. Site inspection

    We visit, inspect the shell, tiles and fittings and define the full work scope

  3. Quotation and approval

    A detailed quote covering works, materials and schedule is submitted for your approval

  4. Drain-down and renovation

    Pool is drained, shell repaired, waterproofing applied and new finish installed

  5. Testing and handover

    Pool is refilled, water level monitored and all fittings checked before handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Pool renovation in Daiya

Call now
What if the old lining cracks when you refill the pool?

We inspect the lining carefully after cleaning and test its flexibility before full refill. If too brittle, we replace it with new lining or repair coating depending on the concrete condition beneath.

How long does it take to clean an old pool and restart it?

It depends on pool size and neglect level. Cleaning a small pool may take a week, but full inspection, repairs and gradual refilling can take two weeks or more depending on damage severity.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works