Rooftop annex design in Kuwait - Faiha

Rooftop annex design in Faiha

Rooftop annex design in Faiha focuses on villas and small apartment buildings with shallow foundations and lighter slabs. We conduct a thorough roof survey and precise load calculation for the added weight before issuing final engineering drawings.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Faiha features low-rise villas and small apartment buildings of three to four storeys on medium-sized plots. Foundations in the area are often shallow at one to two metres deep, and concrete slabs are relatively light and may need additional support beams to carry the new annex. Design accounts for rooftop trees and greenery, safe distances from neighbours and property lines.

Faiha sits in the Capital governorate, a quiet district of villas and small residential buildings near Faiha Park and peaceful residential streets.

Most villas in Faiha sit on shallow foundations no deeper than two metres, which affects calculations for any new annex.

Back to Rooftop annex design

See also: Rooftop annex in Faiha

What the design covers - Rooftop annex design

What the design covers

Full drawing set from site survey and load check through to permit-ready structural and architectural plans

  • Existing roof survey

    On-site measurement of the current slab, columns and beams before any design starts

  • Structural load calculation

    Check that the roof slab can safely carry the annex dead and live loads

  • Architectural drawings

    Floor plans, elevations and opening details at construction scale

  • Structural drawings

    Column, beam and roof slab design with full rebar schedules for the annex

  • Connection point details

    Construction details for dowelling new columns into the existing concrete slab

  • Municipality submission file

    Complete drawing package formatted to Kuwait municipality permit requirements

How it works.

  1. First contact

    Call or WhatsApp us to describe the annex and give the villa location

  2. Site visit

    We visit the roof to measure the slab and assess structural condition and column positions

  3. Load calculations

    We analyse slab capacity and size the new columns, beams and roof slab accordingly

  4. Drawing production

    We produce full architectural and structural drawings with rebar schedules and connection details

  5. Handover and follow-up

    We hand over the final drawing file and assist with municipality submission if needed

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop annex design in Faiha

Call now
Can a villa's roof slab carry an annex the size of one extra room?

It depends on the slab thickness and existing reinforcement. We use non-destructive testing to check the slab and calculate the new load, and may need additional props or beams to distribute the weight.

Does the design include waterproofing details for the new annex?

Yes, the structural drawings include waterproofing details and proper slope for drainage, but the actual waterproofing work is carried out during the finishing phase.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works