
What sets this area apart
Daiya mixes residential villas and modern apartment blocks on medium-sized plots, many new projects built with several storeys needing finished roofs. Foam concrete suits here because it does not overload the upper slabs and pours easily around existing columns and beams. We lay pipes and conduits before pouring and check they stay clear during filling, and monitor slopes for proper drainage.
Daiya sits in Capital governorate near the British School of Kuwait and Daiya Park.
Roof slabs in Daiya are typically 20 centimetres thick, with foam concrete fill added 15 to 25 centimetres above.

What the work covers
Mixed, pumped and finished across roofs, floors, voids and utility trenches in Kuwaiti buildings

Roof levelling layer
Forms drainage falls on flat roofs without adding heavy dead load

Void and cavity fill
Fills under-slab voids, pipe trenches and old tunnels at low pressure

Lightweight floor base
Balances floor levels below screed while reducing load on the structural slab

Service trench backfill
Stable, non-migrating backfill around electrical conduits and drainage pipes

Insulating fill layer
Low density provides partial thermal benefit under Kuwait's intense roof heat

Post-demolition fill
Fills gaps left after removing old services or non-structural demolished elements
How it works.
Call or whatsApp
Describe the location, approximate area and purpose of the foam concrete layer
Site visit
We visit, measure the area, check surface condition and assess pump access
Mix spec and quote
We set the density and strength grade then submit a written quotation
Preparation and pour
Surface prepared, foam mixed to spec, poured and spread to the required level
Finish and handover
Level and density checked after setting, site handed over ready for the next trade
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Foam concrete
Other services in Daiya
Questions about Foam concrete in Daiya
Call nowDoes foam concrete support deep loads under modern roofs?
Foam concrete is lightweight, so it supports light loads and light equipment only. For heavy loads we use standard concrete or a hybrid approach.
How long does foam concrete take to cure on roof before waterproofing?
Usually 3 to 5 days in normal weather, depending on thickness and humidity. We test the fill surface before the waterproof layer is laid.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps