
Screed pouring in Daiya
Screed pouring in Daiya covers intermediate and finishing layers on modern apartment blocks and older villas undergoing renovation. We use calibrated cement mixes and precision levelling tools to achieve a flat, stable surface for finishes without deflection or voids.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Daiya has a mix of multi-storey apartment blocks and villas with varied floor conditions, some on firm soil and some on re-compacted fill. In new buildings we pour the intermediate layer directly over the concrete frame before final finishes, whereas older villas may need old layers removed and full re-levelling. Floor height changes between rooms and corridors require precision in reading site levels and sticking to the structural drawings.
Daiya is in Kuwait City governorate near the British School of Kuwait and a public park, a mix of modern residential buildings and traditional villas.
We verify floor slope to within 1 cm per 10 metres to ensure water drainage and a level surface.

What screed work covers
Screed for floors and surfaces at any stage of construction or renovation

Ground-floor screed
Level bed over the ground slab before floor finishing is laid

Upper-floor screed
Consistent-thickness screed over suspended slabs on each storey

Falls and levelling screed
Creating precise falls toward drains in bathrooms, kitchens and roofs

Wet-area screed
Moisture-tolerant screed shaped to accommodate drainage gradients

Post-demolition screed
Re-levelling floors after partial demolition or strip-out of old finishes

Extension and annex screed
Levelling annex floors to match the finished level of the existing building
How it works.
First contact
Call or WhatsApp us describing the floor area and the work needed
Site inspection
Team visits to measure the area, assess the surface and confirm thickness
Quote and approval
You receive a detailed quote and we start once you approve it
Preparation and pouring
Surface cleaned, screed poured and levelled with required falls achieved
Curing and handover
Layer is wetted and covered to prevent cracking then handed over ready for finishing
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Screed pouring
Other services in Daiya
Questions about Screed pouring in Daiya
Call nowDo you pour screed on older villas with damaged floors?
Yes, we remove all old and damaged layers completely, prepare a solid base, then pour a new level screed to the required heights.
What is the difference between the intermediate and finishing screed layers?
The intermediate layer stabilizes the structure and carries loads, while the finishing screed is thinner and smoother, preparing the surface for tile or marble finishes.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps