Outdoor majlis design in Kuwait - Hateen

Outdoor majlis design in Hateen

Outdoor majlis design in Hateen accounts for extreme heat and seasonal winds affecting residential areas in Hawalli. We produce detailed engineering drawings for structure, finishes and mechanical systems to ensure sound execution from day one.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hateen plots are medium-sized, typically fitting an outdoor majlis 6 to 8 metres long and 5 metres deep with a wide roof sheltering from direct sun. Designs here rely on concrete columns and steel frames to withstand strong summer winds, and require strong natural ventilation to circulate hot air. Drawings show pipe routes and electrical runs with centralised connection points placed away from drainage lines to prevent clashes during construction.

Hateen lies in Hawalli governorate, a residential district with medium-sized plots requiring designs suited to desert climate conditions.

Most outdoor majlis metal roofs in Hateen need to be designed for a minimum wind speed of 80 kilometres per hour per local specifications.

Back to Outdoor majlis design

See also: Outdoor majlis construction in Hateen

What the design covers - Outdoor majlis design

What the design covers

Drawings covering structure, finishes and systems so construction starts on a clear basis.

  • Architectural layout

    Dimensions, openings and orientation suited to the plot.

  • Structural scheme

    Columns, concrete slab and rebar sections sized for the span.

  • Walls and finishes

    Wall, floor and facade material choices set within the drawings.

  • Roof insulation spec

    Thermal and waterproofing layers specified at design stage.

  • Drainage and plumbing

    Surface drainage runs and sanitary provisions where required.

  • Electrical and lighting

    Electrical routes and lighting points drawn into the plan.

How it works.

  1. First contact

    Call or WhatsApp us to describe your outdoor majlis requirements.

  2. Site visit

    We visit the plot to measure, assess soil conditions and check setbacks.

  3. Drawing preparation

    We prepare architectural and structural drawings meeting municipality requirements.

  4. Review and revision

    You review the drawings and request any adjustments needed.

  5. Final handover

    The complete drawing set is handed over ready for submission and construction.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Outdoor majlis design in Hateen

Call now
What is the difference between outdoor majlis design and ordinary building drawings?

Majlis design focuses on lightweight structure, ventilation and sun-wind protection, with separate drawings for the metal roof and natural cooling systems. Standard building drawings cover complete structures with permanent roofs and complex mechanical systems.

Do the drawings include locations for electrical and water connections?

Yes, the drawings mark central connection points and safe routes for pipes and wires away from drainage lines and load-bearing structures. This prevents costly errors and changes during construction.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works