Cement-board annex in Kuwait - Jleeb Al-Shuyoukh

Cement-board annex in Jleeb Al-Shuyoukh

Cement-board annexes in Jleeb Al-Shuyoukh provide quick, lightweight room additions to villas and apartments. We install the steel frame, panels, and complete the interior finishing on-site.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most homes in Jleeb Al-Shuyoukh are older villas and apartments on medium-sized plots, many needing extra space without major structural changes. A cement-board annex fits this need because it requires no deep foundations or excavation, just a light steel frame anchored to the existing floor. The panels handle heat and humidity, and thermal insulation is built in during installation, so occupants move in quickly without waiting for concrete to cure.

Jleeb Al-Shuyoukh sits in Farwaniya governorate, a dense residential district near Jleeb Al-Shuyoukh market.

Exterior cement-board panels require UV and salt-protective paint every two years in residential areas exposed to high heat.

Back to Cement-board annex

What the annex covers - Cement-board annex

What the annex covers

Cement-board rooms handled from frame and panels through to finished interior

  • Cement-board rooms

    Enclosed rooms clad in cement-board panels on a cold-steel frame

  • Cold-steel framing

    Galvanised steel sections forming the load-bearing skeleton for panels

  • Thermal insulation

    Insulation layer inside the wall cavity to reduce interior heat gain

  • Joint and edge sealing

    Sealant applied to all panel joints to block moisture entry

  • Interior finishing

    Tiling or interior paint applied to suit the room's intended use

  • Electrical and AC works

    Conduit runs and AC sleeves installed before panels are closed up

How it works.

  1. First contact

    Call or WhatsApp to describe the required room and its location

  2. Site visit and measurement

    We visit to measure the space and inspect the carrying slab

  3. Quotation and sign-off

    A detailed quote covering materials and finish is submitted then signed

  4. Construction

    Steel frame, panels, insulation, electrical and interior finish in sequence

  5. Handover and check

    Joints and finish are checked before handing the room over for use

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board annex in Jleeb Al-Shuyoukh

Call now
Can you build a cement-board annex on an older villa without digging new foundations?

Yes, we mount the annex on a lightweight steel base over the existing floor, saving time and cost and avoiding disruption to current occupants. The steel frame is anchored to the existing concrete.

How long does installation and finishing of the annex take from start to finish?

After site handover, installation and interior finishing takes 4 to 6 weeks depending on the annex size and specifications.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works