
Cement-board annex in Farwaniya
Cement-board annexes in Farwaniya extend existing villas and apartment buildings on medium-sized plots. We install the metal frame, panels and complete interior finishes with sound and thermal insulation suited to Kuwait's climate.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Farwaniya has residential villas with gardens and apartment blocks on varying plot sizes, with cement-board annexes added to extend living rooms or add storage or guest bedrooms. The lightweight panels allow quick construction without deep foundations, mounted on a simple, level concrete base. Finishing includes wall paint, flooring and suspended ceilings, and we coordinate with the municipality to ensure the addition stays within approved setbacks.
Farwaniya is in Farwaniya governorate, a residential district of villas and apartment blocks along main roads and ring roads.
Exterior cement-board panels require waterproofing on annex facades facing gardens.

What the annex covers
Cement-board rooms handled from frame and panels through to finished interior

Cement-board rooms
Enclosed rooms clad in cement-board panels on a cold-steel frame

Cold-steel framing
Galvanised steel sections forming the load-bearing skeleton for panels

Thermal insulation
Insulation layer inside the wall cavity to reduce interior heat gain

Joint and edge sealing
Sealant applied to all panel joints to block moisture entry

Interior finishing
Tiling or interior paint applied to suit the room's intended use

Electrical and AC works
Conduit runs and AC sleeves installed before panels are closed up
How it works.
First contact
Call or WhatsApp to describe the required room and its location
Site visit and measurement
We visit to measure the space and inspect the carrying slab
Quotation and sign-off
A detailed quote covering materials and finish is submitted then signed
Construction
Steel frame, panels, insulation, electrical and interior finish in sequence
Handover and check
Joints and finish are checked before handing the room over for use
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Cement-board annex
Other services in Farwaniya
Questions about Cement-board annex in Farwaniya
Call nowHow long does it take to build a cement-board annex on a villa?
It depends on the annex size, but from frame installation to final finishing usually takes one to two weeks. We start by preparing the concrete base, then mount the metal frame and panels quickly.
Does a cement-board annex need municipal approval before construction?
Yes, we must submit drawings and dimensions to the municipality to ensure the annex stays within setbacks and allowable coverage. We handle this step and track approval before starting work.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps