
Cement-board annex in Faiha
Cement-board annexes in Faiha expand living space on relatively open plots between villas. We frame the walls and ceilings with composite panels and run core services before final finishing.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Faiha plots typically accommodate a villa with garden and side space for an annex. The annex is built quickly from cement-board panels on a light frame, which reduces load on the existing foundation and keeps the original villa's exterior largely unchanged. The area is quiet and residential, and the municipality requires approval for any addition before work begins. We install the panels square to corners and run water and electrical lines inside the walls before plastering and painting.
Faiha lies in the Capital governorate, a quiet residential district of spaced villas near Faiha Park.
A cement-board annex typically completes from framing to finished interior in six to eight weeks.

What the annex covers
Cement-board rooms handled from frame and panels through to finished interior

Cement-board rooms
Enclosed rooms clad in cement-board panels on a cold-steel frame

Cold-steel framing
Galvanised steel sections forming the load-bearing skeleton for panels

Thermal insulation
Insulation layer inside the wall cavity to reduce interior heat gain

Joint and edge sealing
Sealant applied to all panel joints to block moisture entry

Interior finishing
Tiling or interior paint applied to suit the room's intended use

Electrical and AC works
Conduit runs and AC sleeves installed before panels are closed up
How it works.
First contact
Call or WhatsApp to describe the required room and its location
Site visit and measurement
We visit to measure the space and inspect the carrying slab
Quotation and sign-off
A detailed quote covering materials and finish is submitted then signed
Construction
Steel frame, panels, insulation, electrical and interior finish in sequence
Handover and check
Joints and finish are checked before handing the room over for use
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Cement-board annex
Other services in Faiha
Questions about Cement-board annex in Faiha
Call nowDoes a cement-board annex frame hold enough weight for the roof?
Yes, the light steel frame we use safely supports the panels and roof load. We size columns and beams based on the annex area and expected loads.
Can air conditioning ducts and drainage pipes fit in cement-board walls?
Yes, the wall depth accommodates air ducts and water lines. We plan their routes before panel installation to prevent conflicts and ensure easy access for maintenance.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps