
Cement-board annex in Abdullah Al-Salem
Cement-board annexes in Abdullah Al-Salem add an independent room to the residential plot without structural changes to the main house. We frame, panel, and finish the interior completely within the municipal permit and approved setbacks.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most Abdullah Al-Salem plots hold older residential villas with adequate empty space at the rear or side. A cement-board annex suits this because it builds quickly on a light foundation without deep digging or impact on existing structures. We verify the distance from existing structures, utility and drainage clearance before siting the annex, and confirm the light foundation supports the panel weight, air-conditioning, and finishes.
Abdullah Al-Salem sits in the Capital governorate, a district of older residential villas with green space near the British Embassy area.
We confirm the permitted annex height and required distance from plot boundaries before pouring the light foundation.

What the annex covers
Cement-board rooms handled from frame and panels through to finished interior

Cement-board rooms
Enclosed rooms clad in cement-board panels on a cold-steel frame

Cold-steel framing
Galvanised steel sections forming the load-bearing skeleton for panels

Thermal insulation
Insulation layer inside the wall cavity to reduce interior heat gain

Joint and edge sealing
Sealant applied to all panel joints to block moisture entry

Interior finishing
Tiling or interior paint applied to suit the room's intended use

Electrical and AC works
Conduit runs and AC sleeves installed before panels are closed up
How it works.
First contact
Call or WhatsApp to describe the required room and its location
Site visit and measurement
We visit to measure the space and inspect the carrying slab
Quotation and sign-off
A detailed quote covering materials and finish is submitted then signed
Construction
Steel frame, panels, insulation, electrical and interior finish in sequence
Handover and check
Joints and finish are checked before handing the room over for use
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Cement-board annex
Other services in Abdullah Al-Salem
Questions about Cement-board annex in Abdullah Al-Salem
Call nowCan we build a cement-board annex without breaking up the existing villa flooring?
Yes, the annex is built on a separate spot with its own light foundation. We choose a corner of the yard or rear area and avoid underground pipes and services, so the villa's own flooring stays intact.
How long does it take to hand over a fully finished annex?
After foundation curing, framing, panelling, painting, flooring, electrical, and air-conditioning typically take a few weeks, depending on room size and finish level.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps