Cement-board rooms in Kuwait - Kuwait City

Cement-board rooms in Kuwait City

Solid cement-board rooms in Kuwait City provide a quick and safe addition to existing residential and commercial buildings. We deliver the full steel frame, boarding, thermal insulation and all services in a confined space between the standing structure and neighbouring boundaries.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Kuwait City's older and newer buildings often need additions on limited plots surrounded by neighbouring structures. A cement-board room sits on a light steel frame and carries dense thermal insulation to withstand intense summer heat. Tight spaces and varying roof heights of adjacent buildings require precise measurements before frame installation, and clear separation of electrical and water runs from load-bearing walls. Suspended low ceilings accommodate service routes and insulation without structural cutting.

Kuwait City sits in the Capital governorate, a district of mixed-height and mixed-age buildings on limited plots near Liberation Square and the courts.

Cement-board sheets are fixed to a steel grid with a minimum 5 cm clearance from any existing load-bearing wall.

Back to Cement-board rooms

See also: Cement-board annex in Kuwait City

What the work covers - Cement-board rooms

What the work covers

Delivering a complete cement-board room from steel frame through finishes and services

  • Cement-board panels

    Exterior-grade moisture-resistant panels fixed with self-drilling screws

  • Cold-steel framing

    Galvanised steel sections sized to engineering requirements

  • Thermal insulation

    Rigid insulation board in the wall cavity to block intense heat

  • Joint and edge sealing

    Flexible sealant on every joint and edge against water and dust

  • Interior finishing

    Plaster, paint or tiling to the owner's chosen specification

  • Electrical and AC works

    Electrical conduit and correctly formed AC sleeve through the wall panel

How it works.

  1. First contact

    Call or WhatsApp us to describe the site and required room size

  2. Site survey

    We visit to measure the space and check the existing slab or roof condition

  3. Quote and layout

    We submit a detailed price offer with a layout showing the room and openings

  4. Construction

    Steel frame, panels, insulation, finishes and services installed in correct sequence

  5. Handover and check

    We check joint sealing, earthing and AC fitment before handing over the key

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board rooms in Kuwait City

Call now
Can a cement-board room be built on the roof of an existing Kuwait City building?

Yes, provided the roof can carry the added load of the steel frame, boards and insulation. We review the original structural drawings and calculate loads before installation.

How do you insulate the room thermally against intense summer heat?

We apply rigid polyurethane foam or dense mineral wool at least 10 cm thick between inner and outer boards, with an additional air gap to enhance insulation performance.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works