Rooftop parapet wall in Kuwait - Hateen

Rooftop parapet wall in Hateen

Rooftop parapets in Hateen face seasonal winds and year-round direct sun exposure on residential buildings. We build parapet walls with reinforced concrete columns, stone facing and waterproof coating that withstand every season.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hateen is a residential area with mid-rise apartment blocks and villas with varying roof heights and shapes. Parapet walls here need careful roof-surface preparation because most roofs are older or have prior leaks. We remove sediment, salts and old coating, then pour reinforced concrete columns every 1.5 metres and finish them with marble or cement stone as requested. Waterproofing and final cladding are essential to prevent water ingress into the units below.

Hateen sits in Hawalli governorate near the Hawalli residential area, a district of older apartment and villa buildings.

Most residential roofs in Hateen require salt and moisture removal during preparation before parapet wall construction.

Back to Rooftop parapet wall

See also: Boundary walls & gates in Hateen

What the parapet work covers - Rooftop parapet wall

What the parapet work covers

Roof-surface preparation, masonry, concrete columns, waterproofing, coping and finish

  • Base preparation

    Clean and mark the roof slab line before any masonry begins

  • Reinforced concrete columns

    Cast columns at regular intervals tied into the roof slab

  • Block courses and bed reinforcement

    Hollow block courses with horizontal mesh to resist vertical cracking

  • Waterproofing at base junction

    Continuous membrane where the parapet meets the roof surface

  • Coping and cap

    Sloped concrete or stone coping to shed rainwater away from the wall

  • Render and finish

    UV-resistant cement render and exterior paint on all exposed faces

How it works.

  1. Call or whatsApp

    Contact us and describe the roof condition and the wall height needed

  2. Site survey

    We visit the roof to measure the perimeter and assess the existing slab and membrane

  3. Quotation

    Detailed quote covering block, rebar, waterproofing, coping and finish

  4. Construction

    Base prep, masonry, column casting, waterproofing and render in sequence

  5. Inspection and handover

    We check the membrane lap, coping slope and render before handing over

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop parapet wall in Hateen

Call now
Does an old roof need cleaning before building the parapet wall?

Yes, certainly. We remove sediment, salts, peeling paint and vegetation, then inspect the roof for prior leaks before pouring the concrete columns.

What is the difference between stone and cement finish on parapet walls?

Marble stone lasts longer and looks better but costs more. Cement finish is less costly and easier to maintain and repaint later. Both provide leak protection when paired with proper waterproofing.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works