Two-storey house plans in Kuwait - Taima

Two-storey house plans in Taima

Accurate two-storey villa drawings for Taima include room and amenity distributions with full slab and foundation details on desert soil. We detail each floor with clear separation of residential and service zones suited to the remote location and climate requirements.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Taima is a residential district in southern Jahra with large plots on sandy soil, and most villas need deep foundations and strong horizontal drainage to prevent water pooling. Drawings here focus on distributing the ground floor with spacious halls and sun-shaded terraces, and the first floor with well-ventilated bedrooms. Walls and slabs are drawn with thicknesses suited to thermal and moisture insulation, and foundations are detailed at depths and diameters matching the sandy soil type.

Taima lies in Jahra governorate, a district of desert residential villas where the municipality requires deep foundation details and enhanced thermal insulation.

Two-storey villa drawings in Taima include foundation details on sandy soil and robust horizontal drainage systems.

Back to Two-storey house plans

See also: Architectural design & drawings in Taima

What the drawings cover - Two-storey house plans

What the drawings cover

Complete floor-by-floor layouts from room arrangement to facade and roof slab details

  • Ground floor plan

    Room layout, entrances and service areas on the lower floor

  • First floor plan

    Bedrooms, living spaces and stairwell openings on the upper floor

  • Facade elevations

    All four elevations showing openings, heights and exterior finish lines

  • Structural sections

    Vertical sections showing slab thickness, column and beam dimensions

  • Stair and void coordination

    Stair position aligned with beams and storey heights across both floors

  • Roof and tank layout

    Water tank positions and roof drainage slopes marked on the roof plan

How it works.

  1. First contact

    Call or WhatsApp us with plot size and project requirements

  2. Plot review

    We review the plot document, boundaries and any zoning limits affecting storey height

  3. First draft

    Ground and first floor plans drawn to scale and sent for your review

  4. Revision and approval

    Layout and facade comments are incorporated until final drawings are approved

  5. Formal handover

    Drawings delivered in print-ready PDF with the responsible engineer's stamp

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Two-storey house plans in Taima

Call now
How are the villas drawn to withstand sandy soil and poor drainage?

We specify deep foundations with large diameter to distribute load on sandy soil, and draw robust horizontal drainage networks around the building base. Lower walls are insulated with moisture barriers.

Do the drawings account for strong thermal insulation in desert climate?

Yes, walls, roof and floors are drawn with thicknesses and insulating layers suited to high temperatures. Windows are detailed in position and size to minimize direct sun penetration.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works