House plans by plot size in Kuwait - Firdous

House plans by plot size in Firdous

Your home plan in Firdous begins with precise on-site measurement of your plot and becomes stamped engineering drawings ready for the municipality. We read plot dimensions, boundaries and setbacks and produce a professional site plan and architectural design.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Firdous plots are relatively new, ranging from 700 to 1,100 square metres, mostly built after 2005 on a regular grid of streets and ring roads. This means setbacks are fairly uniform and government services run systematically underground. When designing the plan we leverage these advantages to ensure smooth later execution, but we verify each plot individually as minor angle or depth variations can require design adjustment.

Firdous is in Farwaniya governorate, a modern residential zone on the Sixth Ring Road with regular layout and relatively uniform plots.

Firdous plots typically have a depth of 30 to 35 metres and a width of 20 to 25 metres.

Back to House plans by plot size

See also: Architectural design & drawings in Firdous

What the drawing covers - House plans by plot size

What the drawing covers

Plot dimensions read and translated into a stamped plan ready for permit submission

  • Plot dimension analysis

    Lengths, angles and net buildable area calculated before any layout begins

  • Room distribution

    Rooms and entrances arranged to suit the plot size and owner requirements

  • Setbacks and coverage

    Front, side and rear setbacks applied to match municipality regulations

  • Structural column grid

    Column positions fixed to match plot width and standard span widths

  • Building elevations

    All four elevations drawn to show the final building form on the plot

  • Licensed engineer stamp

    Drawings signed and stamped by a licensed engineer for municipality submission

How it works.

  1. Call or whatsApp us

    Send the plot number, area and intended number of floors

  2. Plot document review

    We check the title deed and survey data to confirm actual plot dimensions

  3. First draft

    Room layout, column grid and setbacks drawn and sent for your review

  4. Revision and approval

    Your comments on the layout are applied and the final version approved

  5. Stamped handover

    Signed, stamped and printed drawings delivered ready for municipality submission

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about House plans by plot size in Firdous

Call now
Does the plan include mapping of underground utilities?

The architectural plan shows required utility clearances per regulations. We obtain utility information from the municipality and relevant authorities and add it to the plan for reference.

How long does it take to design the plot plan from the moment of measurement?

After on-site measurement, we produce the initial plan within several days. Revisions and approvals follow based on landowner or municipality feedback.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works