Two-storey annex in Kuwait - Hateen

Two-storey annex in Hateen

A two-storey annex in Hateen extends the villa with a separate, safe concrete frame on the existing villa plot. We monitor municipality setbacks and distances from boundary walls, and hand over the structure ready for interior and exterior finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hateen villas sit on medium-sized plots with fixed setback distances from boundaries, most built two decades or longer ago with no side annexes. A two-storey annex is designed as a separate frame connected to the main villa's side wall or slightly detached per the municipality-approved setbacks. This requires independent foundations, columns and beams aligned to the boundary lines, and careful ground-level survey before excavation to ensure the existing building stays stable.

Hateen is in Hawalli governorate, a low-density residential villa area on regular plots set back from main roads.

Approved setbacks from boundaries in Hateen are typically at least one metre from an existing villa wall.

Back to Two-storey annex

See also: Annex construction in Hateen

What the work covers - Two-storey annex

What the work covers

Design, permits, structure, finishing, and handover for a two-storey annex

  • Drawings and permits

    Annex drawings prepared and permit file submitted to the municipality

  • Concrete frame

    Reinforced columns, beams, and slabs for both floors

  • Structural tie-in

    Dowel bars drilled and epoxy-fixed into existing columns and beams

  • Walls and insulation

    Block walls built with thermal and waterproof insulation to roof

  • Services rough-in

    Drainage, electrical, and water lines laid before floor screeds

  • Full finishing

    Tiling, gypsum, paint, aluminium, and glazing to handover

How it works.

  1. First contact

    Call or WhatsApp us to describe the villa and available plot area

  2. Site assessment

    We visit to inspect foundations, columns, and municipality setback limits

  3. Design and permits

    Structural and architectural drawings prepared and permit file submitted

  4. Construction and supervision

    Excavation, pour, block work, and finishing under continuous engineering supervision

  5. Handover

    Final inspection and handover with as-built drawings and site documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Two-storey annex in Hateen

Call now
Can a two-storey annex be built directly attached to the main villa wall?

It depends on the plot's approved municipality setbacks and the boundary wall position. We coordinate with the municipality first, then either attach directly or leave a small gap per approval.

Are the annex foundations different from the old villa's foundations?

Yes, the annex needs separate foundations designed to its own soil study and new excavation depth, as the old villa may sit on different soil or depth.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works