Two-storey annex in Kuwait - Faiha

Two-storey annex in Faiha

Two-storey annexes in Faiha expand villas on relatively spacious plots in a quiet residential area away from central density. The design makes efficient use of available space and respects municipality-approved setbacks before construction starts.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Faiha is a quiet residential area with spacious plots larger than central zones, featuring villas of varying heights and ages. The two-storey annex benefits from the plot's greater depth and width, but you must stay within the permitted occupancy ratio. Faiha's soil is more stable than coastal areas, allowing standard-depth foundations without major settlement concerns. Permits require municipality approval of the annex and review of any geotechnical data available.

Faiha sits in the Capital governorate, a quiet residential area with spacious plots and villas of varying heights.

The occupancy ratio for a two-storey annex in Faiha may not exceed the ratio approved in the original plot's permit.

Back to Two-storey annex

See also: Annex construction in Faiha

What the work covers - Two-storey annex

What the work covers

Design, permits, structure, finishing, and handover for a two-storey annex

  • Drawings and permits

    Annex drawings prepared and permit file submitted to the municipality

  • Concrete frame

    Reinforced columns, beams, and slabs for both floors

  • Structural tie-in

    Dowel bars drilled and epoxy-fixed into existing columns and beams

  • Walls and insulation

    Block walls built with thermal and waterproof insulation to roof

  • Services rough-in

    Drainage, electrical, and water lines laid before floor screeds

  • Full finishing

    Tiling, gypsum, paint, aluminium, and glazing to handover

How it works.

  1. First contact

    Call or WhatsApp us to describe the villa and available plot area

  2. Site assessment

    We visit to inspect foundations, columns, and municipality setback limits

  3. Design and permits

    Structural and architectural drawings prepared and permit file submitted

  4. Construction and supervision

    Excavation, pour, block work, and finishing under continuous engineering supervision

  5. Handover

    Final inspection and handover with as-built drawings and site documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Two-storey annex in Faiha

Call now
Is Faiha's soil suitable for a standard-depth separate foundation?

Yes, Faiha's soil is relatively stable and allows standard excavation depth without major differential settlement concerns. We inspect the soil before digging to confirm the design suits conditions.

Must the annex entrance be lower than the original villa's level?

Not necessarily, but design depends on drainage and approved slopes. We design the stairs and entry to match the surrounding ground level and plot contours.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works