
Additional floor in Hawalli
Adding a floor in Hawalli requires careful structural assessment of the existing foundations and frame before any work begins. We verify that columns and beams can carry the new storey, then execute from reinforcement through handover as one project.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most Hawalli residential buildings are three to four storeys on medium-sized plots, and the original foundations were designed to carry those loads only. Adding a floor means checking the original structural drawings and verifying column and foundation thickness; we often need to reinforce the column with a combined footing or controlled stress method. The enclosed site between neighbouring buildings demands strict protection procedures for excavation and pouring, plus separate municipality permits for the structural modification.
Hawalli lies in Hawalli governorate and contains closely packed residential buildings with shops and services interspersed between structures.
Columns in older Hawalli buildings are typically 40 to 50 centimetres in diameter and need load testing before reinforcement decisions are made.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Hawalli
Questions about Additional floor in Hawalli
Call nowHow do we verify that old building foundations can support an added floor?
We take soil samples around the existing foundation and test them in the lab, and review the original structural drawings and expected loads. If the soil or foundations are weak, we widen the foundation or add new support columns.
Can we add a floor to an old building without demolishing part of the roof?
Yes, but we first study the existing roof's strength. If the roof can bear the temporary load of new columns, we use it as a working platform; otherwise we remove only necessary sections.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps