Additional floor in Kuwait - Yarmouk

Additional floor in Yarmouk

Adding a new floor to a villa or apartment block in Yarmouk requires a full structural assessment of the existing foundations and frame. We handle the engineering survey, design, and full construction from assessment through handover, ensuring the footings and columns carry the added load safely.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Villas and apartment blocks in Yarmouk are mostly older structures built on standard, shallow footings under older codes. Adding one floor first requires testing the concrete quality of the existing foundations and columns to determine their load capacity, and we usually find the footings need reinforcement with cement piles driven beneath them. The clay and sand under Yarmouk are of medium density, so the old shallow foundations often cannot handle the extra load without strengthening.

Yarmouk is in the Capital governorate, a residential district of older villas and apartment buildings near Yarmouk Co-op.

Soil and concrete foundation testing takes seven to ten working days before the final design report is issued.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Yarmouk

Call now
How do we verify that old foundations can handle an extra floor?

We take samples from the foundation concrete and soil beneath it, then test them in the lab. The results determine whether the footings need pile reinforcement or can safely carry the additional load.

Can we build the new floor while residents occupy the building?

Yes, but we need prior coordination. We install scaffolding and safety barriers, and designate separate routes for workers and residents to minimize disruption and safety risks.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works