Additional floor in Kuwait - Bnaid Al-Qar

Additional floor in Bnaid Al-Qar

Additional floor work in Bnaid Al-Qar combines assessing the existing structure on beachfront plots near the old airport road with executing appropriate reinforcements. We follow extra standards for buildings near the coast.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Bnaid Al-Qar villas sit on relatively small beachfront plots with deep sandy soil and salt spray from the sea that affects concrete and foundation durability. Buildings here need special attention because the harsh coastal environment accelerates steel and concrete corrosion. When adding a floor, we inspect the existing concrete quality, reinforcement and erosion state, and may need to treat the foundation for salt deposits or deepen the piles. We also use salt-resistant concrete for new pours and provide extra expansion joints to reduce thermal and salt stress.

Bnaid Al-Qar sits in the Capital governorate near the waterfront and the old airport road, a district of small beachfront plots exposed to salt and wind.

Beachfront buildings in Bnaid Al-Qar require regular inspections of reinforcement and concrete every few years due to accelerated salt corrosion.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Bnaid Al-Qar

Call now
Is ordinary concrete adequate for an additional floor near the sea?

No. We use salt-resistant concrete with special cementitious materials and corrosion-protected steel reinforcement. Coastal buildings require stricter standards to ensure longer service life.

Does the sandy foundation in Bnaid Al-Qar need deeper pilings?

It may depend on soil condition and the new loads. We take soil samples and calculate bearing capacity, and if capacity is low we recommend deepening piles or adding a separate foundation for the new floor.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works