Third-floor addition in Kuwait - Ardhiya Industrial

Third-floor addition in Ardhiya Industrial

Adding a third floor to an existing warehouse or factory structure in Ardhiya Industrial begins with thorough assessment of the foundations and steel or concrete columns. We evaluate bearing capacity, then prepare formwork, pouring, service runs and final finishes.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Ardhiya Industrial contains warehouses and factories with concrete or steel structures of two or three storeys, with wide spans between columns for machinery loading and unloading. These large spans mean the existing beams and columns carry heavy loads, so adding a third floor requires careful study of the structure's capacity for the extra weight. The work also needs an industrial permit from the relevant authorities and confirmation it will not interfere with ongoing operations in the lower floors.

Ardhiya Industrial sits in Farwaniya governorate, a district of warehouses and factories with heavy structural frames.

Most steel columns in existing factories carry high lateral wind loads and dynamic loads from operating machinery.

Back to Third-floor addition

See also: Additional floor in Ardhiya Industrial

What the work covers - Third-floor addition

What the work covers

Structural assessment through finished, permitted handover of the complete third floor.

  • Structural assessment

    Columns, beams and foundations checked before any new load is added.

  • Drawings and permits

    Architectural and structural drawings prepared and permit submitted to the municipality.

  • Concrete frame

    Columns, beams and slab poured with heat-cured concrete to resist cracking.

  • Block walls

    Block walls tied to the new frame with horizontal bond steel at every third course.

  • Rebar tie-in

    Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

  • Insulation and finishing

    New roof slab insulated and third floor finished to the agreed specification.

How it works.

  1. First contact

    Call or WhatsApp us describing the villa and its current floor count.

  2. Structure check

    Engineer visits to inspect existing columns, beams and rebar condition.

  3. Design and permit

    Architectural and structural drawings prepared and building permit obtained.

  4. Construction

    Concrete frame poured and block walls built under continuous engineering supervision.

  5. Finishing and handover

    Third floor fully finished and handed over with new roof slab insulated.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Third-floor addition in Ardhiya Industrial

Call now
Can a third floor be added to a two-storey factory without stopping production?

Yes, but with careful planning. We work on separate sections of the frame, and use extra protection for workers and lower-level equipment. Work must be coordinated with the factory manager to avoid interference with production lines.

What is the typical clear span between columns in industrial warehouses?

Typical clear spans range from 8 to 12 metres in one direction, and may reach 15 metres in newer factories. These large spans mean high loads on beams and columns, which affects the feasibility of adding upper floors.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works