Additional floor in Kuwait - Sulaibikhat

Additional floor in Sulaibikhat

Adding a floor in Sulaibikhat involves inspecting the structure and foundations with special care for the coastal environment and shallow clay. We assess bearing capacity and implement necessary reinforcement before starting.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sulaibikhat is a coastal area of villas and apartment blocks on medium plots of 25 to 40 metres, many built on shallow foundations in damp clay soil near water. Clay shifts seasonally due to moisture and salt, affecting foundation stability, so when studying extra floors we conduct repeated soil tests and geotechnical studies. If foundations prove sound, we may need subsurface cement injection or deeper new footings to prevent settlement.

Sulaibikhat lies in the Capital governorate on the Kuwait Gulf coast, where residential buildings and villas extend near the North Ring Road waterfront.

Clay soil in Sulaibikhat extends only 8 to 12 metres deep before dense sand, which limits safe load capacity for shallow footings.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Sulaibikhat

Call now
Can coastal clay soil safely support additional foundations?

Clay requires precise geotechnical study. We test bearing factors, moisture and salinity, then design deeper foundations or inject subsurface cement to ensure stability.

Is settlement and cracking common in Sulaibikhat when adding a new floor?

Yes, if soil is not studied well. Before any work we check clay depth and seasonal moisture, and implement ground improvement to prevent settlement.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works