
Additional floor in Sulaibikhat
Adding a floor in Sulaibikhat involves inspecting the structure and foundations with special care for the coastal environment and shallow clay. We assess bearing capacity and implement necessary reinforcement before starting.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Sulaibikhat is a coastal area of villas and apartment blocks on medium plots of 25 to 40 metres, many built on shallow foundations in damp clay soil near water. Clay shifts seasonally due to moisture and salt, affecting foundation stability, so when studying extra floors we conduct repeated soil tests and geotechnical studies. If foundations prove sound, we may need subsurface cement injection or deeper new footings to prevent settlement.
Sulaibikhat lies in the Capital governorate on the Kuwait Gulf coast, where residential buildings and villas extend near the North Ring Road waterfront.
Clay soil in Sulaibikhat extends only 8 to 12 metres deep before dense sand, which limits safe load capacity for shallow footings.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Sulaibikhat
Questions about Additional floor in Sulaibikhat
Call nowCan coastal clay soil safely support additional foundations?
Clay requires precise geotechnical study. We test bearing factors, moisture and salinity, then design deeper foundations or inject subsurface cement to ensure stability.
Is settlement and cracking common in Sulaibikhat when adding a new floor?
Yes, if soil is not studied well. Before any work we check clay depth and seasonal moisture, and implement ground improvement to prevent settlement.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps